Lot-sizing and scheduling for flexible flow lines

被引:5
作者
Quadt, D [1 ]
机构
[1] Catholic Univ Eichstatt Ingolstadt, Fac Business Adm & Econ, D-52049 Ingolstadt, Germany
来源
LOT-SIZING AND SCHEDULING FOR FLEXIBLE FLOW LINES | 2004年 / 546卷
关键词
D O I
10.1007/978-3-642-17101-7_1
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:1 / +
页数:223
相关论文
共 147 条
[1]   BPSS - A SCHEDULING SUPPORT SYSTEM FOR THE PACKAGING INDUSTRY [J].
ADLER, L ;
FRAIMAN, N ;
KOBACKER, E ;
PINEDO, M ;
PLOTNICOFF, JC ;
WU, TP .
OPERATIONS RESEARCH, 1993, 41 (04) :641-648
[2]   Scheduling of flexible flow lines in an automobile assembly plant [J].
Agnetis, A ;
Pacifici, A ;
Rossi, F ;
Lucertini, M ;
Nicoletti, S ;
Nicolo, F ;
Oriolo, G ;
Pacciarelli, D ;
Pesaro, E .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 97 (02) :348-362
[3]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[4]  
[Anonymous], 2000, SOLVE IT MODERN HEUR
[5]  
ARAS OA, 1982, J OPERATIONS MANAGEM, V2, P177
[6]   Use of genetic algorithms to solve production and operations management problems: a review [J].
Aytug, H ;
Khouja, M ;
Vergara, FE .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (17) :3955-4009
[7]   A flexible flowshop problem with total flow time minimization [J].
Azizoglu, M ;
Çakmak, E ;
Kondakci, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 132 (03) :528-538
[8]   DETERMINING LOT SIZES AND RESOURCE REQUIREMENTS - A REVIEW [J].
BAHL, HC ;
RITZMAN, LP ;
GUPTA, JND .
OPERATIONS RESEARCH, 1987, 35 (03) :329-345
[9]  
BAKER T, 1989, CHES PROBLEMS WORKIN
[10]  
Barr R. S., 1995, Journal of Heuristics, V1, P9, DOI 10.1007/BF02430363