Economic production quantity with maintenance interruptions under random and correlated yields

被引:15
作者
Nasr, Walid W. [1 ]
Salameh, Moueen [1 ]
Moussawi-Haidar, Lama [2 ]
机构
[1] Amer Univ Beirut, Fac Engn & Architecture, Ind Engn & Management, Beirut, Lebanon
[2] Amer Univ Beirut, Olayan Sch Business, Beirut, Lebanon
关键词
inventory management; production economics; random yield; probabilistic models; correlated binomial supply; manufacturing processes; IMPERFECT PRODUCTION PROCESSES; PRODUCTION SYSTEM; INSPECTION POLICY; LEARNING-CURVES; QUALITY; REDUCTION; REWORKS; DEMAND; REPAIR; MODEL;
D O I
10.1080/00207543.2016.1265684
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper considers an economic production quantity with imperfect items where the quality of items produced within the same production run is correlated. Production and scheduled maintenance policies for a correlated binomial production system are investigated. We study the impact of correlation on the system performance measures and draw insights in terms of the effect of correlation on the production and maintenance policies. We also illustrate that the popular and commonly used interrupted geometric production systems can be analysed by an equivalent correlated binomial production model.
引用
收藏
页码:4544 / 4556
页数:13
相关论文
共 29 条
[1]   Economic optimization of off-line inspection in a process that also produces non-conforming units when in control and conforming units when out of control [J].
Bendavid, Illana ;
Herer, Yale T. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 195 (01) :139-155
[2]   Production planning and backup sourcing strategy of a buyer-dominant supply chain with random yield and demand [J].
Chen, Kebing ;
Xiao, Tiaojun .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2015, 46 (15) :2799-2817
[3]   Random yield and coordination mechanisms of a supply chain with emergency backup sourcing [J].
Chen, Kebing ;
Yang, Lei .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (16) :4747-4767
[4]   Inspection scheduling for imperfect production processes under free repair warranty contract [J].
Giri, B. C. ;
Dohi, T. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 183 (01) :238-252
[5]   Multiple lotsizing in production to order with random yields: Review of recent advances [J].
Grosfeld-Nir, A ;
Gerchak, Y .
ANNALS OF OPERATIONS RESEARCH, 2004, 126 (1-4) :43-69
[6]  
Gurnani H, 2000, IIE TRANS, V32, P701, DOI 10.1080/07408170008967428
[7]   The finite multiple lot sizing problem with interrupted geometric yield and holding costs [J].
Guu, SM ;
Zhang, AX .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 145 (03) :635-644
[8]   The impact of information sharing, random yield, correlation, and lead times in closed loop supply chains [J].
Hosoda, Takamichi ;
Disney, Stephen M. ;
Gavirneni, Srinagesh .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (03) :827-836
[9]   Optimal production run time for a deteriorating production system under an extended inspection policy [J].
Hu, Fei ;
Zong, Qun .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2009, 196 (03) :979-986
[10]   Modified base-stock policies for semiconductor production system with dependent yield rates [J].
Huang, Huei-Chuen ;
Song, Haiqing .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (01) :206-217