Real-Time Safety Evaluation for Slope during Construction Using Numerical Forecast and Sensor Monitoring Platform

被引:8
作者
Zhang, Sherong [1 ,2 ]
Hou, Dejun [1 ,2 ]
Wang, Chao [1 ,2 ,3 ]
Cao, Xuexing [4 ]
Zhang, Fenghua [1 ,2 ]
Pan, Fei [5 ]
Du, Chengbo [6 ]
机构
[1] Tianjin Univ, State Key Lab Hydraul Engn Simulat & Safety, Tianjin 300072, Peoples R China
[2] Tianjin Univ, Sch Civil Engn, Tianjin 300072, Peoples R China
[3] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Hubei, Peoples R China
[4] Huaneng Lancang River Hydropower INC, Kunming 650051, Yunnan, Peoples R China
[5] Shanghai Municipal Engn Design Inst Grp Co Ltd, Shanghai 200092, Peoples R China
[6] Yalong River Hydropower Dev Co Ltd, Chengdu 610051, Sichuan, Peoples R China
基金
国家重点研发计划; 中国国家自然科学基金;
关键词
slope engineering; real-time safety evaluation; real-time system; construction schedule; information technologies; EARLY WARNING SYSTEM; LANDSLIDE SUSCEPTIBILITY; STABILITY; MODEL; MANAGEMENT; HAZARD; PREDICTION; FAILURE; TERRAIN; SURFACE;
D O I
10.3390/s18092978
中图分类号
O65 [分析化学];
学科分类号
070302 ; 081704 ;
摘要
Geology uncertainties and real-time construction modification induce an increase of construction risk for large-scale slope in hydraulic engineering. However, the real-time evaluation of slope safety during construction is still an unsettled issue for mapping large-scale slope hazards. In this study, the real-time safety evaluation method is proposed coupling a construction progress with numerical analysis of slope safety. New revealed geological information, excavation progress adjustment, and the support structures modification are updating into the slope safety information model-by-model restructuring. A dynamic connection mapping method between the slope restructuring model and the computable numerical model is illustrated. The numerical model can be generated rapidly and automatically in database. A real-time slope safety evaluation system is developed and its establishing method, prominent features, and application results are briefly introduced in this paper. In our system, the interpretation of potential slope risk is conducted coupling dynamic numerical forecast and monitoring data feedback. The real case study results in a comprehensive real-time safety evaluation application for large slope that illustrates the change of environmental factor and construction state over time.
引用
收藏
页数:16
相关论文
共 40 条
[21]   Displacement based multiple wedge slope stability analysis [J].
McCombie, Paul F. .
COMPUTERS AND GEOTECHNICS, 2009, 36 (1-2) :332-341
[22]  
Oliver M. A., 1990, International Journal of Geographical Information Systems, V4, P313, DOI 10.1080/02693799008941549
[23]   Stochastic Modeling of Progressive Failure in Heterogeneous Soil Slop [J].
Pathak, D. ;
Gharti, H. ;
Singh, A. ;
Hiratsuka, A. .
GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2008, 26 (02) :113-120
[24]   Slope safety evaluation by integrating multi-source monitoring information [J].
Peng, M. ;
Li, X. Y. ;
Li, D. Q. ;
Jiang, S. H. ;
Zhang, L. M. .
STRUCTURAL SAFETY, 2014, 49 :65-74
[25]   Wavelet Denoising Method for Improving Detection Performance of Distributed Vibration Sensor [J].
Qin, Zengguang ;
Chen, Liang ;
Bao, Xiaoyi .
IEEE PHOTONICS TECHNOLOGY LETTERS, 2012, 24 (07) :542-544
[26]   Deterministic and probabilistic multi-modal analysis of slope stability [J].
Reale, Cormac ;
Xue, Jianfeng ;
Pan, Zhangming ;
Gavin, Kenneth .
COMPUTERS AND GEOTECHNICS, 2015, 66 :172-179
[27]   Dam safety prediction model considering chaotic characteristics in prototype monitoring data series [J].
Su, Huaizhi ;
Wen, Zhiping ;
Chen, Zhexin ;
Tian, Shiguang .
STRUCTURAL HEALTH MONITORING-AN INTERNATIONAL JOURNAL, 2016, 15 (06) :639-649
[28]   Digital elevation model resolution: effects on terrain attribute calculation and quantitative soil-landscape modeling [J].
Thompson, JA ;
Bell, JC ;
Butler, CA .
GEODERMA, 2001, 100 (1-2) :67-89
[29]   Spatial data for landslide susceptibility, hazard, and vulnerability assessment: An overview [J].
van Westen, Cees J. ;
Castellanos, Enrique ;
Kuriakose, Sekhar L. .
ENGINEERING GEOLOGY, 2008, 102 (3-4) :112-131
[30]   A Real-Time Online Structure-Safety Analysis Approach Consistent with Dynamic Construction Schedule of Underground Caverns [J].
Wang, Chao ;
Zhang, Sherong ;
Du, Chengbo ;
Pan, Fei ;
Xue, Lie .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (09)