Warranty cost analysis: Increasing warranty repair times

被引:16
作者
Marshall, Sarah [1 ]
Arnold, Richard [2 ]
Chukova, Stefanka [2 ]
Hayakawa, Yu [3 ]
机构
[1] Auckland Univ Technol, Sch Engn Comp & Math Sci, Private Bag 92006, Auckland 1142, New Zealand
[2] Victoria Univ Wellington, Sch Math & Stat, Wellington, New Zealand
[3] Waseda Univ, Sch Int Liberal Studies, Tokyo, Japan
基金
日本学术振兴会;
关键词
generalised alternating renewal process; geometric process; warranty; REPLACEMENT; POLICY;
D O I
10.1002/asmb.2323
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this study, we model the warranty servicing costs under nonrenewing and renewing free repair warranties. We assume nonzero increasing repair times with the warranty cost depending on the length of the repair time. An increasing geometric process is used to model the consecutive repair times. We introduce the generalised alternating renewal process, which is an alternating process with cycles consisting of an item's operational time followed by the corresponding repair time. We derive analytical results for a generalised alternating renewal process with a finite time horizon and use them to evaluate the warranty costs over the warranty period and over the life cycle of the product under the nonrenewing free repair warranty and renewing free repair warranty. Properties of the model are demonstrated through a simulation study and through the application to warranty claims data from an automotive manufacturer.
引用
收藏
页码:544 / 561
页数:18
相关论文
共 14 条
[1]  
[Anonymous], 1996, Stochastic Processes
[2]  
Blischke W.R., 1996, PRODUCT WARRANTY HDB
[3]   Warranty cost analysis: non-renewing warranty with repair time [J].
Chukova, S ;
Hayakawa, Y .
APPLIED STOCHASTIC MODELS IN BUSINESS AND INDUSTRY, 2004, 20 (01) :59-71
[4]  
Chukova S., 2004, INT J RELIABILITY QU, V11, P93
[5]  
Fang Y., 2006, J ZHEJIANG, V7, P207
[6]  
Gokhale S, 2004, 10 INT S SOFTW METR
[7]   Computational approximations of renewal process relating to a warranty problem: The case of phase-type lifetimes [J].
Kao, EPC ;
Smith, MS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (01) :156-170
[8]  
Lam Y., 2007, The geometric process and its applications
[9]  
Pham H, 1996, EUR J OPER RES, V90, P156
[10]   AN AGE-BASED REPLACEMENT POLICY WITH NONZERO REPAIR TIMES FOR A CONTINUOUS PRODUCTION PROCESS [J].
PINTELON, LMA ;
VANPUYVELDE, FLB ;
GELDERS, LF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (08) :2111-2123