Reliability constraint stochastic UC by considering the correlation of random variables with Copula theory

被引:170
作者
Yu, Dongmin [1 ]
Ghadimi, Noradin [2 ]
机构
[1] Northeast Elect Power Univ, Dept Elect Engn, Jilin 132012, Jilin, Peoples R China
[2] Islamic Azad Univ, Ardabil Branch, Young Researchers & Elite Club, Ardebil, Iran
关键词
power generation economics; Monte Carlo methods; stochastic programming; linear programming; power markets; stochastic processes; wind power plants; power generation dispatch; probability; integer programming; power system reliability; power generation scheduling; stochastic elements outage; transmission lines; stochastic interdependence; wind speed; correlated random variables; Copula theory; correlation structure; stochastic UC problem; reliability constraints; reliability point; introduced stochastic UC; RTS-96-bus test system; wind energy; load inconstancy; reliability constraint stochastic UC; reliability constraint stochastic model; unit commitment problem; transmission constraints; high wind penetration; volatility; mixed-integer linear programme; linear direct current model; approach models uncertainty; wind generators output power; load demand fluctuations; UNIT COMMITMENT; RENEWABLE ENERGY; MODEL;
D O I
10.1049/iet-rpg.2019.0485
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This essay performs a reliability constraint stochastic model for unit commitment problem by considering generation and transmission constraints with high wind penetration and volatility of load demands. This query is expressed as a MILP that is based on the linear direct current model. The proposed approach models uncertainty of wind generators output power, load demand fluctuations and stochastic elements outage of the system like generators and transmission lines. In this paper, stochastic interdependence between random variables like wind speed and load demand is recognized. To establish the probability distribution of these correlated random variables, Copula theory is applied. Correlation structure between wind speed of different locations and a group of loads existing in the same area is investigated and studied based on historical data. For representing these uncertainties in the stochastic unit commitment problem, possible scenarios are generated with Monte Carlo simulation method. The reliability constraints are utilized in each scenario to evaluate the feasibility of solutions from a reliability point. The introduced stochastic UC is executed on the RTS 96-bus test system. Numerical results demonstrate the advantages of implementing stochastic programming on the UC problem by taking into account the intermittent behavior of wind energy and load inconstancy.
引用
收藏
页码:2587 / 2593
页数:7
相关论文
共 32 条
  • [1] An Analytical Methodology for Assessment of Smart Monitoring Impact on Future Electric Power Distribution System Reliability
    Ahadi, Amir
    Ghadimi, Noradin
    Mirabbasi, Davar
    [J]. COMPLEXITY, 2015, 21 (01) : 99 - 113
  • [2] Reliability assessment for components of large scale photovoltaic systems
    Ahadi, Amir
    Ghadimi, Noradin
    Mirabbasi, Davar
    [J]. JOURNAL OF POWER SOURCES, 2014, 264 : 211 - 219
  • [3] Fuzzy stochastic long-term model with consideration of uncertainties for deployment of distributed energy resources using interactive honey bee mating optimization
    Ahmadian I.
    Abedinia O.
    Ghadimi N.
    [J]. Frontiers in Energy, 2014, 8 (04) : 412 - 425
  • [4] Extracting Appropriate Nodal Marginal Prices for All Types of Committed Reserve
    Akbary, Paria
    Ghiasi, Mohammad
    Pourkheranjani, Mohammad Reza Rezaie
    Alipour, Hamidreza
    Ghadimi, Noradin
    [J]. COMPUTATIONAL ECONOMICS, 2019, 53 (01) : 1 - 26
  • [5] Two-stage robust UC including a novel scenario-based uncertainty model for wind power applications
    Alvarez-Miranda, Eduardo
    Campos-Valdes, Camilo
    Rahmann, Claudia
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2015, 101 : 94 - 105
  • [6] [Anonymous], 2010, DECISION MAKING UNCE
  • [7] Effective Load Carrying Capability Evaluation of Renewable Energy via Stochastic Long-Term Hourly Based SCUC
    Chen, Zhi
    Wu, Lei
    Shahidehpour, Mohammad
    [J]. IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2015, 6 (01) : 188 - 197
  • [8] Short-term electricity load forecasting of buildings in microgrids
    Chitsaz, Hamed
    Shaker, Hamid
    Zareipour, Hamidreza
    Wood, David
    Amjady, Nima
    [J]. ENERGY AND BUILDINGS, 2015, 99 : 50 - 60
  • [9] An analytical methodology for reliability assessment and failure analysis in distributed power system
    Ghiasi, Mohammad
    Ghadimi, Noradin
    Ahmadiniaz, Esmaeil
    [J]. SN APPLIED SCIENCES, 2019, 1 (01):
  • [10] DEVELOPMENT OF A NEW PROCEDURE FOR RELIABILITY MODELING OF WIND TURBINE GENERATORS
    GIORSETTO, P
    UTSUROGI, KF
    [J]. IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1983, 102 (01): : 134 - 143