Factors Affecting the Performance of Construction Projects in Pakistan

被引:2
|
作者
Iqbal, Muhammad [1 ]
Khan, Imtiaz [1 ]
Ahmad, Fawad [1 ]
Ahad, Muhammad Zeeshan [1 ]
Munir, Mehre [2 ]
机构
[1] Iqra Natl Univ, Dept Civil Engn, Peshawar, Pakistan
[2] Iqra Natl Univ, Dept Elect Engn, Peshawar, Pakistan
来源
JOURNAL OF MECHANICS OF CONTINUA AND MATHEMATICAL SCIENCES | 2019年 / 14卷 / 03期
关键词
Construction Project; the project performance objectives; planning; designing programming; infrastructure projects;
D O I
10.26782/jmcms.2019.06.00025
中图分类号
O3 [力学];
学科分类号
08 ; 0801 ;
摘要
There is a French dictum "when the construction industry prospers everything prospers". Construction, a term that encompasses activities related to the creation of physical infrastructure and related activities, plays a crucial role in the economy of any country with estimated share of 40-60 % in gross fixed capital formation and having linkage of more than 60 other associated industries. Today, construction is the second largest sector in Pakistan's economy after agriculture. Roughly 30-35% of employment is directly or indirectly affiliated with the construction sector. In Pakistan, a Construction Project can be categorized as high risk as it is very complex and involves a variety of stakeholders looking after their own interests. In order to make sure that the projects are completed within the key measures of budgeted cost, allocated time and required quality, identification of causes affecting the project performance is very much necessary so that stakeholders can take proactive steps to avoid such situations and manage effectively and systematically to achieve the project performance objectives of time, cost and quality. The purpose of this Paper is to investigate the major obstacles and constraints in the performance of construction projects in Pakistan. In this paper a local construction project case study and facts which I observed during my 16+ years of experience in dealing with construction projects are taken into account to document the bottlenecks. The case study is the construction of Earth Dam Project in Tribal region of KPK, where I worked as a Resident Engineer. The project performance has been suffered adversely equally by roles played by the design consultant, the Employer, the supervisory consultant, the Contractor and country political situation and regional security. Finally, main recommendations with discussions are presented that will help to overcome the related obstacles and hindrances in project performance in construction industry of Pakistan. Similar methodology is adopted in Document of the World Bank Discussion Paper Series: Technical Note:9 LOCAL CASE STUDIES November 2007, where case studies of several past infrastructure projects in different sectors including roads, airport, motoway and irrigation were reviewed to document the bottlenecks which occurred during the various processes involved in the life cycle of infrastructure projects. Identifying such processes allows a better understanding of the capacity constraints in planning, designing, programming, procurement, contract administration, financing and budgeting, execution and other stages in a project cycle.
引用
收藏
页码:336 / 358
页数:23
相关论文
共 50 条
  • [21] Risk factors affecting the construction projects in the developing countries
    Bahamid, R. A.
    Doh, S., I
    Al-Sharaf, M. A.
    NATIONAL COLLOQUIUM ON WIND AND EARTHQUAKE ENGINEERING, 2019, 244
  • [22] Determining the Critical Success Factors for Highway Construction Projects in Pakistan
    Sohu, Samiullah
    Jhatial, Ashfaque Ahmed
    Ullah, Kaleem
    Lakhiar, Muhammad Tahir
    Shahzaib, Jam
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2018, 8 (02) : 2685 - 2688
  • [23] Critical factors affecting schedule performance A case of Ethiopian public construction projects - engineers' perspective
    Sinesilassie, Ephrem Girma
    Tabish, Syed Zafar Shahid
    Jha, Kumar Neeraj
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (05) : 757 - 773
  • [24] Study on factors affecting the performance of construction projects and developing a cost prediction model using ANN
    Alias, Melba
    Dhanya, R.
    Ramasamy, Ganapathy
    International Journal of Earth Sciences and Engineering, 2015, 8 (05): : 2189 - 2194
  • [25] Identification of crucial performance measurement factors affecting construction projects in Iraq during the implementation phase
    Zamim, Salah Kh.
    COGENT ENGINEERING, 2021, 8 (01):
  • [26] Complexity Factors During Pre-Construction Stage Affecting Quality Performance in Infrastructure Projects
    Nen, Akhtarul Norfaiza Che
    Isa, Che Maznah Mat
    Nusa, Fatin Najwa Mohd
    Ibrahim, Che Khairil Izam Che
    2020 11TH IEEE CONTROL AND SYSTEM GRADUATE RESEARCH COLLOQUIUM (ICSGRC), 2020, : 253 - 258
  • [27] Identifying the performance areas affecting the project performance for Indian construction projects
    Ingle, Prachi Vinod
    Mahesh, Gangadhar
    Deepak, M. D.
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2021, 19 (01) : 1 - 20
  • [28] Modeling of Factors Affecting Worker Engagement in Construction Projects in Thailand
    Ngowtanasuwan, Grit
    PROCEEDINGS OF 6TH INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING AND ARCHITECTURE, VOL 2, ICCEA 2023, 2024, 531 : 279 - 288
  • [29] Critical Factors Affecting the Bid Cost of Building Construction Projects
    Shrestha, Kishor
    Shrestha, Pramen P.
    Lohoud, Mohamed
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2023, 15 (03)
  • [30] Fuzzy Ordering of the Factors Affecting the Implementation of Construction Projects in Poland
    Ibadov, Nabi
    Kulejewski, Janusz
    Krzeminski, Michal
    11TH INTERNATIONAL CONFERENCE OF NUMERICAL ANALYSIS AND APPLIED MATHEMATICS 2013, PTS 1 AND 2 (ICNAAM 2013), 2013, 1558 : 1298 - 1301