Engineering application of membrane bioreactor for wastewater treatment in China: Current state and future prospect

被引:115
作者
Xiao, Kang [1 ,2 ]
Xu, Ying [1 ]
Liang, Shuai [1 ,3 ]
Lei, Ting [1 ]
Sun, Jianyu [1 ]
Wen, Xianghua [1 ]
Zhang, Hongxun [2 ]
Chen, Chunsheng [1 ]
Huang, Xia [1 ]
机构
[1] Tsinghua Univ, Sch Environm, State Key Joint Lab Environm Simulat & Pollut Con, Beijing 100084, Peoples R China
[2] Univ Chinese Acad Sci, Coll Resources & Environm, Beijing 100049, Peoples R China
[3] Beijing Forestry Univ, Coll Environm Sci & Engn, Beijing 100083, Peoples R China
关键词
membrane bioreactor (MBR); engineering application; wastewater treatment; review; China;
D O I
10.1007/s11783-014-0756-8
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
China has been the forerunner of large-scale membrane bioreactor (MBR) application. Since the first large-scale MBR (>= 10 000 m(3).d(-1)) was put into operation in 2006, the engineering implementation of MBR in China has attained tremendous development. This paper outlines the commercial application of MBR since 2006 and provides a variety of engineering statistical data, covering the fields of municipal wastewater, industrial wastewater, and polluted surface water treatment. The total treatment capacity of MBRs reached 1 x 10(6) m(3).d(-1) in 2010, and has currently exceeded 4.5 x 10(6) m(3).d(-1) with similar to 75% of which pertaining to municipal wastewater treatment. The anaerobic/anoxic/aerobic-MBR and its derivative processes have been the most popular in the large-scale municipal application, with the process features and typical ranges of parameters also presented in this paper. For the treatment of various types of industrial wastewater, the configurations of the MBR-based processes are delineated with representative engineering cases. In view of the significance of the cost issue, statistics of capital and operating costs are also provided, including cost structure and energy composition. With continuous stimulation from the environmental stress, political propulsion, and market demand in China, the total treatment capacity is expected to reach 7.5 x 10(6) m(3).d(-1) by 2015 and a further expansion of the market is foreseeable in the next five years. However, MBR application is facing several challenges, such as the relatively high energy consumption. Judging MBR features and seeking suitable application areas should be of importance for the long-term development of this technology.
引用
收藏
页码:805 / 819
页数:15
相关论文
共 54 条
[1]  
[Anonymous], 2005, GBT199232005
[2]  
[Anonymous], 2005, GBT197722005
[3]  
[Anonymous], 2013, CHIN ENV Y B
[4]  
Chen G W, 2013, ADV DEV IND APPL MEM
[5]  
Cheng Guangzeng, 2008, Electric Power Science and Engineering, V24, P24
[6]  
China Association for Engineering Construction Standardization, 2003, CECS1522003
[7]   Exploring price effects on the residential water conservation technology diffusion process: a case study of Tianjin city [J].
Chu, Junying ;
Wang, Hao ;
Wang, Can .
FRONTIERS OF ENVIRONMENTAL SCIENCE & ENGINEERING, 2013, 7 (05) :688-698
[8]   Selection and application of risk management tools and techniques for build-operate-transfer projects [J].
Dey, PK ;
Ogunlana, SO .
INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2004, 104 (3-4) :334-346
[9]  
[董良飞 Dong Liangfei], 2012, [中国给水排水, China Water & Wastewater], V28, P20
[10]  
E20 Environment Platform, 2014, RES AN REP MBR MARK