IEC 61850 Based Breaker Failure Protection Scheme Design for TNB Double Busbar Substation

被引:0
作者
Noran, Mohd Noorfazly [1 ]
Ridwan, Mohd Iqbal [1 ]
Shokri, Muhamad Shahmi M. [1 ]
Sabtu, Hairol Rizat [1 ]
Shukri, Zainoren [2 ]
机构
[1] TNB Res Sdn Bhd, Util Automat Grp, Kuala Lumpur, Malaysia
[2] Tenaga Nasl Berhad, Transmiss Div, Kuala Lumpur, Malaysia
来源
2014 IEEE INNOVATIVE SMART GRID TECHNOLOGIES - ASIA (ISGT ASIA) | 2014年
关键词
IEC; 61850; Breaker Failure Initiation; Breaker Failure Busbar Intertrip; GOOSE; Logical Node;
D O I
暂无
中图分类号
TP3 [计算技术、计算机技术];
学科分类号
0812 ;
摘要
IEC 61850 Communication Networks and System for Power Utility Automation is an open standard which enable the information exchange between Intelligent Electronic Devices (IEDs) from different manufacturers. The standard has introduced the standard communication services such as client-server communication, server-to-server communication named Generic Object Oriented Substation Event (GOOSE)/Generic Substation Status Event (GSSE) message and sampled value communication service for the current and voltage measurement transmission. These communication services provide seamless communication for information exchange between IEDs from different vendors. IEC 61850 has also standardized the engineering process for the Protection and Control (P&C) scheme communication configuration. With the utilization of Ethernet communication technology by IEC 61850 for substation P&C, it can simplify TNB protection and control scheme architecture with less hardwires connection. Based on the advantages of the standard which can be gained by TNB for protection and control scheme, this paper is intended to provide the practical design for IEC 61850 based Breaker Failure Protection (BFP) scheme which can be adopted in TNB's double busbar substation. This paper also specifies the GOOSE message configuration for this scheme design that can be considered for future implementation in TNB IEC 61850 Substation.
引用
收藏
页码:697 / 702
页数:6
相关论文
共 9 条
  • [1] Aguilar R., P 2010 IEEE PES TRAN, P1
  • [2] Ali I., 2012, INT J COMPUTER APPL, V38, P16
  • [3] [Anonymous], 2012, 2012 IEEE 5 POW IND, DOI DOI 10.1109/POWERI.2012.6479511
  • [4] Dolezilek D., 2011, PROT AUT CONTR UNPUB
  • [5] Hakala-Ranta A., P 2009 CIRED EL DI 1, P1
  • [6] Joshi S., 2010, 16 NAT POW SYS UNPUB
  • [7] Design of a Backup IED for IEC 61850-Based Substation
    Lim, Il-Hyung
    Sidhu, Tarlochan S.
    [J]. IEEE TRANSACTIONS ON POWER DELIVERY, 2013, 28 (04) : 2048 - 2055
  • [8] Park J., P 2012 IEEE ADV INF, P329
  • [9] Sidhu T., P 2011 IEEE ADV POW, P1384