摘要
We investigate a new scheduling problem, multiple-orders-per-job (MOJ), in the context of a two-machine flowshop. Lower bounds for the makespan performance measure are provided for combinations of lot-processing and item-processing machines. An optimization model is presented that addresses both job formation and job sequencing. We define a heuristic to minimize the makespan for the MOJ problem for two-machine item-processing flowshops. The heuristic obtains solutions within 2% of a tight lower bound and runs in O(HF) time, where H is the number of orders and F is the restricted number of jobs. (c) 2006 Elsevier B. V. All rights reserved.
引用
收藏
页码:63 / 79
页数:17
相关论文
共 50 条
  • [31] Minimizing Total Tardiness in a Two-Machine Flowshop Scheduling Problem with Availability Constraints
    Rakrouki, Mohamed Ali
    Aljohani, Abeer
    Alharbe, Nawaf
    Berrais, Abdelaziz
    Ladhari, Talel
    INTELLIGENT AUTOMATION AND SOFT COMPUTING, 2023, 35 (01): : 1119 - 1134
  • [32] Minimizing the total completion time in a two-machine flowshop with sequence-independent setup times
    Ladhari, T.
    Msakni, M. K.
    Allahverdi, A.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2012, 63 (04) : 445 - 459
  • [33] Minimizing total completion time in a two-machine flowshop: Analysis of special cases
    Hoogeveen, JA
    Kawaguchi, T
    MATHEMATICS OF OPERATIONS RESEARCH, 1999, 24 (04) : 887 - 910
  • [34] Heuristic algorithms for the two-machine flowshop with limited machine availability
    Blazewicz, J
    Breit, J
    Formanowicz, P
    Kubiak, W
    Schmidt, G
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2001, 29 (06): : 599 - 608
  • [35] Scheduling of a two-machine flowshop with availability constraints on the first machine
    Allaoui, H
    Artiba, A
    Elmaghraby, SE
    Riane, F
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 99 (1-2) : 16 - 27
  • [36] Two-machine flowshop batching and scheduling
    Lin, BMT
    Cheng, TCE
    ANNALS OF OPERATIONS RESEARCH, 2005, 133 (1-4) : 149 - 161
  • [37] A two-machine flowshop problem with two agents
    Lee, Wen-Chiung
    Chen, Shiuan-Kang
    Chen, Cheng-Wei
    Wu, Chin-Chia
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 98 - 104
  • [38] Scheduling multiple orders per job in a single machine to minimize total completion time
    Mason, Scott J.
    Chen, Jen-Shiang
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (01) : 70 - 77
  • [39] MINIMIZING THE NUMBER OF MACHINE IDLE INTERVALS WITH MINIMUM MAKESPAN IN A FLOWSHOP
    LIAO, CJ
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1993, 44 (08) : 817 - 824
  • [40] Schedule Execution for Two-Machine Job-Shop to Minimize Makespan with Uncertain Processing Times
    Sotskov, Yuri N.
    Matsveichuk, Natalja M.
    Hatsura, Vadzim D.
    MATHEMATICS, 2020, 8 (08)