Minimizing makespan with multiple-orders-per-job in a two-machine flowshop

被引:11
|
作者
Laub, Jeffrey D. [1 ]
Fowler, John W. [1 ]
Keha, Ahmet B. [1 ]
机构
[1] Arizona State Univ, Tempe, AZ 85287 USA
关键词
scheduling; flowshop; multiple-orders-per-job; semiconductor manufacturing;
D O I
10.1016/j.ejor.2006.07.023
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We investigate a new scheduling problem, multiple-orders-per-job (MOJ), in the context of a two-machine flowshop. Lower bounds for the makespan performance measure are provided for combinations of lot-processing and item-processing machines. An optimization model is presented that addresses both job formation and job sequencing. We define a heuristic to minimize the makespan for the MOJ problem for two-machine item-processing flowshops. The heuristic obtains solutions within 2% of a tight lower bound and runs in O(HF) time, where H is the number of orders and F is the restricted number of jobs. (c) 2006 Elsevier B. V. All rights reserved.
引用
收藏
页码:63 / 79
页数:17
相关论文
共 50 条
  • [1] Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed
    Sung, CS
    Kim, YH
    COMPUTERS & OPERATIONS RESEARCH, 2002, 29 (03) : 275 - 294
  • [2] Minimizing makespan on a two-machine re-entrant flowshop
    Choi, S-W
    Kim, Y-D
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2007, 58 (07) : 972 - 981
  • [3] Minimizing energy consumption and makespan in a two-machine flowshop scheduling problem
    Mansouri, S. Afshin
    Aktas, Emel
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2016, 67 (11) : 1382 - 1394
  • [4] Three-machine flowshop with two operations per job to minimize makespan
    Su, Ling-Huey
    Lin, Cheng-Te
    COMPUTERS & INDUSTRIAL ENGINEERING, 2006, 50 (03) : 286 - 295
  • [5] Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times
    An, Young-Jin
    Kim, Yeong-Dae
    Choi, Seong-Woo
    COMPUTERS & OPERATIONS RESEARCH, 2016, 71 : 127 - 136
  • [6] MINIMIZING THE MAKESPAN IN TWO-MACHINE JOB SHOP SCHEDULING PROBLEMS WITH NO MACHINE IDLE-TIME
    Hermes, Fatma
    Carlier, Jacques
    Moukrim, Aziz
    Ghedira, Khaled
    ICINCO 2009: PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL 1: INTELLIGENT CONTROL SYSTEMS AND OPTIMIZATION, 2009, : 89 - +
  • [7] A two-machine flowshop makespan scheduling problem with deteriorating jobs
    Lee, Wen-Chiung
    Wu, Chin-Chia
    Wen, Chien-Chih
    Chung, Yu-Hsiang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (04) : 737 - 749
  • [8] Scheduling Piecewise Linear Deteriorating Jobs to Minimize Makespan in a Two-Machine Flowshop
    Jafari-Nodoushan A.
    Zare H.K.
    Lotfi M.M.
    Tavakkoli-Moghaddam R.
    Operations Research Forum, 2 (4)
  • [9] An efficient simple metaheuristic for minimizing the makespan in two-machine no-wait job shops
    Liaw, Ching-Fang
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (10) : 3276 - 3283
  • [10] Minimizing makespan in a two-machine flow shop with effects of deterioration and learning
    Wang, Ji-Bo
    Ji, P.
    Cheng, T. C. E.
    Wang, Dan
    OPTIMIZATION LETTERS, 2012, 6 (07) : 1393 - 1409