A shuffled frog-leaping algorithm for job shop scheduling with outsourcing options

被引:26
作者
Lei, Deming [1 ]
Guo, Xiuping [2 ]
机构
[1] Wuhan Univ Technol, Sch Automat, Wuhan, Peoples R China
[2] Southwest Jiaotong Univ, Sch Econ & Management, Chengdu, Peoples R China
基金
中国国家自然科学基金;
关键词
job shop scheduling; outsourcing; shuffled frog-leaping algorithm; total tardiness; COLONY OPTIMIZATION APPROACH;
D O I
10.1080/00207543.2015.1088970
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, job shop scheduling problem with outsourcing options is considered and a novel shuffled frog-leaping algorithm (SFLA) is presented to minimise total tardiness under condition that total outsourcing cost does not exceed a given upper bound. In SFLA, a tournament selection-based method is used to decompose the whole population into some memeplexes, the search process in each memeplex is done on the best solution of the memeplex and composed of the global search step and the multiple neighbourhood search step. SFLA is tested on a number of instances and compared with some methods from the literature. Computational results validate the promising performance of SFLA on the considered problem.
引用
收藏
页码:4793 / 4804
页数:12
相关论文
共 27 条
[1]   A study of simple rules for subcontracting in make-to-order manufacturing [J].
Bertrand, JWM ;
Sridharan, V .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 128 (03) :509-531
[2]  
BIERWIRTH C, 1995, OR SPEKTRUM, V17, P87, DOI 10.1007/BF01719250
[3]   Scheduling with subcontracting options [J].
Chen, Zhi-Long ;
Li, Chung-Lun .
IIE TRANSACTIONS, 2008, 40 (12) :1171-1184
[4]   OUTSOURCING DECISIONS IN m-MACHINE PERMUTATION FLOW SHOP SCHEDULING PROBLEMS WITH MACHINE-DEPENDENT PROCESSING TIMES [J].
Choi, Byung-Cheon ;
Park, Myoung-Ju .
ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2014, 31 (04)
[5]   Two-machine flow shop scheduling problem with an outsourcing option [J].
Choi, Byung-Cheon ;
Chung, Jibok .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 213 (01) :66-72
[6]   Outsourcing and scheduling for two-machine ordered flow shop scheduling problems [J].
Chung, Dae-Young ;
Choi, Byung-Cheon .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2013, 226 (01) :46-52
[7]   A new approach to job shop scheduling problems with due date constraints considering operation subcontracts [J].
Chung, DY ;
Lee, K ;
Shin, K ;
Park, J .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 98 (02) :238-250
[8]   Shuffled frog-leaping algorithm: a memetic meta-heuristic for discrete optimization [J].
Eusuff, M ;
Lansey, K ;
Pasha, F .
ENGINEERING OPTIMIZATION, 2006, 38 (02) :129-154
[9]  
Fang C., 2013, COMPUTERS OPERATIONS, V39, P890
[10]   Bi-objective job shop scheduling with outsourcing options [J].
Guo, Xiuping ;
Lei, Deming .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (13) :3832-3841