共 14 条
- [2] FERNANDES CJL, 1995, ENG DESIGN AUTOMAT, V1, P33
- [3] Helgeson W.B., 1961, Journal of Industrial Engineering, V12, P394
- [4] *ILOG, 1999, ILOG OPL STUD 3 0
- [5] Cyclic scheduling in synchronous production lines [J]. IIE TRANSACTIONS, 1999, 31 (08) : 709 - 719
- [6] PRODUCTION-LINE BALANCES FOR MIXED-MODEL LINES [J]. MANAGEMENT SCIENCE SERIES B-APPLICATION, 1972, 19 (04): : 423 - 434
- [8] Roberts S.D., 1970, AIIE T, V2, P361, DOI DOI 10.1080/05695557008974777
- [9] Scholl A., 1997, INFORMS Journal on Computing, V9, P319, DOI 10.1287/ijoc.9.4.319
- [10] SCHOLL A, 1997, 1693 TU DARMST