AN ECONOMIC PRODUCTION QUANTITY MODEL WITH RANDOM DEFECTIVE RATE IN IMPERFECT PRODUCTION PROCESSES

被引:0
作者
Eroglu, Abdullah [1 ]
Sutcu, Abdullah [2 ]
Sulak, Harun [3 ]
机构
[1] Suleyman Demirel Univ, Iktisadi & Idari Bilimler Fak, Isletme Bolumu, TR-32260 Isparta, Turkey
[2] Suleyman Demirel Univ, Orman Fak, Orman Endustri Muhendisligi Bolumu, TR-32260 Isparta, Turkey
[3] Pamukkale Univ, Iktisadi & Idari Bilimler Fak, Iktisat Bolumu, Denizli, Turkey
来源
JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY | 2008年 / 23卷 / 04期
关键词
EPQ; inventory management; rework; batch size;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Determining the optimal production quantity has been widely used by the classic economic production quantity (EPQ) model. However, the analysis for finding an EPQ model has many faults which led many researchers to make extensions in several aspects on the original EPQ model. The basic assumption of EPQ is that 100% of manufactured products are non-defective. This assumption is not valid for many production processes. In this paper a modified EPQ model has been developed. In this model, a portion of the defective items is considered to be scrap, rework and imperfect quality which are sold to a particular purchaser at a lower price. The wooden chipboard production process and high voltage transformers producing process give good examples for such situations. A mathematical model has been developed and for illustration of model a numerical examples are presented.
引用
收藏
页码:923 / 929
页数:7
相关论文
共 50 条
[21]   Economic Production Quantity with Imperfect Quality, Imperfect Inspections, Sales Return, and Allowable Shortages [J].
Al-Salamah, Muhammad .
2016 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATIONS (ICIMSA), 2016,
[22]   An economic production quantity model for deteriorating items with multiple production setups and rework [J].
Widyadana, Gede Agus ;
Wee, Hui Ming .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 138 (01) :62-67
[23]   An economic production quantity inventory model for multi-product imperfect production system with setup time/cost function [J].
Nobil, Amir Hossein ;
Niaki, Seyed Taghi Akhavan ;
Niaki, Seyed Armin Akhavan ;
Cardenas-Barron, Leopoldo Eduardo .
REVISTA DE LA REAL ACADEMIA DE CIENCIAS EXACTAS FISICAS Y NATURALES SERIE A-MATEMATICAS, 2022, 116 (01)
[24]   Optimal batch quantity in a cleaner multi-stage lean production system with random defective rate [J].
Tayyab, Muhammad ;
Sarkar, Biswajit .
JOURNAL OF CLEANER PRODUCTION, 2016, 139 :922-934
[25]   Economic production quantity models for deteriorating/imperfect products and service with rework [J].
Tai, Allen H. .
COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 66 (04) :879-888
[26]   Effects of Imperfect Quality and Defective Items on Economic Production Lot Size [J].
Raafat N Ibrahim ;
Paul Lochert .
厦门大学学报(自然科学版), 2002, (S1) :247-247
[27]   Impact of Inspection Error of an Economic Production Quantity Model with Acceptance Sampling, Defective Items, and Rework [J].
Palanivel, M. ;
Venkadesh, M. .
CONTEMPORARY MATHEMATICS, 2024, 5 (01) :665-684
[28]   An economic production quantity model for three levels of production with Weibull distribution deterioration and shortage [J].
Viji, G. ;
Karthikeyan, K. .
AIN SHAMS ENGINEERING JOURNAL, 2018, 9 (04) :1481-1487
[29]   A multi-item fuzzy economic production quantity problem with a finite production rate [J].
Bjork, Kaj-Mikael .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2012, 135 (02) :702-707
[30]   An economic production quantity model with non-synchronized screening and rework [J].
Wee, Hui-Ming ;
Wang, Wan-Tsu ;
Kuo, Tsai-Chi ;
Cheng, Yung-Lung ;
Huang, Yen-Deng .
APPLIED MATHEMATICS AND COMPUTATION, 2014, 233 :127-138