Modeling and measuring product development cycle time across industries

被引:95
|
作者
Griffin, A [1 ]
机构
[1] Univ Chicago, Grad Sch Business, Chicago, IL 60637 USA
关键词
product development; metrics; cycle time;
D O I
10.1016/S0923-4748(97)00004-0
中图分类号
F [经济];
学科分类号
02 ;
摘要
As global competitive pressure increases and product life cycles compress, companies are trying to shorten product development cycles. This article relates the actual length of product development cycle times (in months) for project data from 21 divisions of 11 firms in 5 industries to project, process and team structure factors with statistically significant results. The model and data quantify the impact of project newness and complexity (the number of functions a product performs) on increasing development cycle time length. The data also demonstrate how much impact using a cross-functional product development team has on decreasing cycle time. (C) 1997 Elsevier Science B.V.
引用
收藏
页码:1 / 24
页数:24
相关论文
共 50 条
  • [41] Modeling Distributed Product Development Processes in Small and Medium Enterprises
    Mkrtchyan, Armen
    Srinivasan, Jayakanth
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [42] Research on Virtual Prototyping Development of Product Information Modeling Method
    Chen, Tian
    MATERIALS AND MANUFACTURING TECHNOLOGY, PTS 1 AND 2, 2010, 129-131 : 658 - 663
  • [43] Design and application of ProA based on product development process modeling
    Sha Quanyou
    Qin Xiansheng
    Fan Zhe
    Lei Youfa
    Jiang Zhiqiang
    ISTM/2007: 7TH INTERNATIONAL SYMPOSIUM ON TEST AND MEASUREMENT, VOLS 1-7, CONFERENCE PROCEEDINGS, 2007, : 6144 - 6147
  • [44] The Use of Digital Human Modeling in Ergonomic Design and Product Development
    Dahibhate G.
    Shinde R.
    Sakle N.
    Journal of The Institution of Engineers (India): Series C, 2023, 104 (05) : 1133 - 1138
  • [45] On the use of global cost modeling early in new product development
    Marion, Tucker J.
    IEMC - EUROPE 2008: INTERNATIONAL ENGINEERING MANAGEMENT CONFERENCE, EUROPE, CONFERENCE PROCEEDINGS: MANAGING ENGINEERING, TECHNOLOGY AND INNOVATION FOR GROWTH, 2008, : 355 - 361
  • [46] Development of a Model for Predicting Cycle Time in Hot Stamping
    Muvunzi, R.
    Dimitrov, D. M.
    Matope, S.
    Harms, T. M.
    15TH GLOBAL CONFERENCE ON SUSTAINABLE MANUFACTURING, 2018, 21 : 84 - 91
  • [47] Mobilizing resources in product development by organizational interfaces across firms, units and functions
    Sundquist, Viktoria
    Melander, Lisa
    JOURNAL OF BUSINESS & INDUSTRIAL MARKETING, 2021, 36 (02) : 307 - 323
  • [48] Product mix optimization under required cycle time for semiconductor wafer fabrication
    Yu, Chih-Min
    Kuo, Chung-Jen
    Chiu, Chih-Lin
    Wen, Wei-Chin
    Zhang, Minghua
    2018 INTERNATIONAL SYMPOSIUM ON SEMICONDUCTOR MANUFACTURING (ISSM), 2018,
  • [49] Balancing Development Costs and Sales to Optimize the Development Time of Product Line Additions*
    Langerak, Fred
    Griffin, Abbie
    Hultink, Erik Jan
    JOURNAL OF PRODUCT INNOVATION MANAGEMENT, 2010, 27 (03) : 336 - 348
  • [50] Structural equation modelling - FTOPSIS approach for modelling barriers to product development in medical device manufacturing industries
    Kirkire, Milind Shrikant
    Rane, Santosh B.
    Abhyankar, Gayatri Jayant
    JOURNAL OF MODELLING IN MANAGEMENT, 2020, 15 (03) : 967 - 993