Minsum scheduling with acceptable lead-times and optional job rejection

被引:5
作者
Mor, Baruch [1 ]
Shapira, Dana [2 ]
机构
[1] Ariel Univ, Dept Econ & Business Adm, Ariel, Israel
[2] Ariel Univ, Dept Comp Sci, Ariel, Israel
关键词
Single-machine scheduling; Due-date assignment; Minsum; Job-rejection; Dynamic programming; DUE-DATE ASSIGNMENT; WEIGHTED TARDINESS MINIMIZATION; APPROXIMATION SCHEME; MACHINE; WINDOW;
D O I
10.1007/s11590-021-01763-8
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In our current fast-paced era, customers are often willing to pay extra premium for shorter lead times, which motivates further research on the scheduling problem with due-date assignment and customer-specified lead times. As part of this effort, we extend the classic minsum 'DIF' scheduling model to allow optional job-rejection, thus adding an important component of real-life applications, namely, the possibility that the scheduler decides to process only a subset of the jobs and outsource the disjoint set. The scheduler is penalised for rejecting certain jobs by setting job-dependent rejection costs, and he is limited by a given upper bound on the total rejection cost. The most general version of the minsum DIF problem includes job-dependent cost parameters and lead-times, and it is strongly NP-hard. Therefore, we study six variants of the problem, where either only the cost parameters or the lead-times are job dependent. All alternatives are extended by optional job-rejection that possibly bounds the constraints or the underlying cost functions. We establish that all studied problems are NP-hard in the ordinary sense and present pseudo-polynomial dynamic programming algorithms and extensive numerical studies for most solutions.
引用
收藏
页码:1073 / 1091
页数:19
相关论文
共 24 条
[1]  
Cao ZG, 2006, LECT NOTES COMPUT SC, V3959, P90
[2]   MINIMIZING TOTAL TARDINESS ON ONE MACHINE IS NP-HARD [J].
DU, JZ ;
LEUNG, JYT .
MATHEMATICS OF OPERATIONS RESEARCH, 1990, 15 (03) :483-495
[3]   Single machine scheduling problems with generalised due-dates and job-rejection [J].
Gerstl, Enrique ;
Mosheiov, Gur .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (11) :3164-3172
[4]   Minmax scheduling with acceptable lead-times: Extensions to position-dependent processing times, due-window and job rejection [J].
Gerstl, Enrique ;
Mor, Baruch ;
Mosheiov, Gur .
COMPUTERS & OPERATIONS RESEARCH, 2017, 83 :150-156
[5]   Scheduling with a due-window for acceptable lead-times [J].
Gerstl, Enrique ;
Mosheiov, Gur .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2015, 66 (09) :1578-1588
[6]   Minmax due-date assignment with a time window for acceptable lead-times [J].
Gerstl, Enrique ;
Mosheiov, Gur .
ANNALS OF OPERATIONS RESEARCH, 2013, 211 (01) :167-177
[7]   Fully polynomial time approximation scheme for the total weighted tardiness minimization with a common due date [J].
Kacem, Imed .
DISCRETE APPLIED MATHEMATICS, 2010, 158 (09) :1035-1040
[8]   A fully polynomial approximation scheme for the single machine weighted total tardiness problem with a common due date [J].
Kellerer, Hans ;
Strusevich, Vitaly A. .
THEORETICAL COMPUTER SCIENCE, 2006, 369 (1-3) :230-238
[9]   A note on "Fully polynomial time approximation scheme for the total weighted tardiness minimization with a common due date" [J].
Kianfar, K. ;
Moslehi, G. .
DISCRETE APPLIED MATHEMATICS, 2013, 161 (13-14) :2205-2206
[10]  
Lawler EL., 1977, ANN DISCRETE MATH, V1, P331, DOI [DOI 10.1016/S0167-5060(08)70742-8, 10.1016/S0167-5060(08)70742-8]