Optimal Hybrid Energy Storage System Planning of Community Multi-Energy System Based on Two-Stage Stochastic Programming

被引:26
作者
Shen, Xin [1 ,2 ,3 ]
Luo, Zhao [2 ]
Xiong, Jun [1 ]
Liu, Hongzhi [2 ]
Lv, Xin [2 ]
Tan, Taiyang [1 ]
Zhang, Jianwei [1 ]
Wang, Yuting [4 ]
Dai, Yinghao [2 ]
机构
[1] Yunnan Power Grid Co Ltd, Metering Ctr, Kunming 650051, Yunnan, Peoples R China
[2] Kunming Univ Sci & Technol, Fac Elect Power Engn, Kunming 650500, Yunnan, Peoples R China
[3] Kunming Univ Sci & Technol, Dept Mech & Elect Engn, Kunming 650500, Yunnan, Peoples R China
[4] Yunnan Commun Vocat & Tech Coll, Kunming 650500, Yunnan, Peoples R China
基金
中国国家自然科学基金;
关键词
Planning; Uncertainty; Batteries; Load modeling; Stochastic processes; Renewable energy sources; Space heating; Battery; community multi-energy system; hybrid energy storage system; mixed-integer linear programming; operational flexibility; renewable energy; thermal storage tank; two-stage stochastic programming; uncertainty; NATURAL-GAS; OPTIMAL OPERATION; RENEWABLE ENERGY; TRANSMISSION; ELECTRICITY; MANAGEMENT; DISPATCH; NETWORK; LOAD; HUB;
D O I
10.1109/ACCESS.2021.3074151
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The multi-energy system (MES) provides a good environment for the local consumption of renewable energy such as wind and solar power because of its high operational flexibility. In the MES, the hybrid energy storage system (HESS) composed of the battery and thermal storage tank plays an important role in enhancing reliability, economics, and operational flexibility. Hence, determining the optimal size of HESS in the MES is a critical problem but has not received enough attention. In light of this problem, this paper focuses on the optimal HESS planning problem in the community MES (CMES) under diverse uncertainties. Firstly, a two-stage stochastic planning model is proposed for the CMES to coordinate the optimal long-term HESS allocation and the short-term system operation. The thermal inertia in the heating network, space heating demand, and domestic hot water demand is utilized to reduce both the planning and operational cost. Secondly, a deterministic equivalence is proposed for the two-stage planning model to convert it into a mixed-integer linear programming model, which is then solved by off-the-shelf solvers. Finally, simulation results verify the effectiveness of the proposed method. The results reveal that the HESS can enhance the operational flexibility of the CMES but only needs a very few investment costs and prove that the thermal inertia in the CMES can reduce the investment cost of HESS, the fuel, and the operational maintenance cost.
引用
收藏
页码:61035 / 61047
页数:13
相关论文
共 39 条
[1]  
[Anonymous], 2020, IEEE ACCESS, DOI DOI 10.1109/ACCESS.2020.2982412
[2]  
[Anonymous], 2020, ENERGY, DOI DOI 10.1016/j.energy.2020.118139
[3]  
[Anonymous], 2020, INT J ELEC POWER, DOI DOI 10.1016/j.ijepes.2019.105755
[4]  
[Anonymous], 2017, P 7 SOL INT WORKSH
[5]   Capacity Planning of Energy Hub in Multi-Carrier Energy Networks: A Data-Driven Robust Stochastic Programming Approach [J].
Cao, Yang ;
Wei, Wei ;
Wang, Jianhui ;
Mei, Shengwei ;
Shafie-khah, Miadreza ;
Catalao, Joao P. S. .
IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2020, 11 (01) :3-14
[6]   Low carbon transition pathway of power sector with high penetration of renewable energy [J].
Chen, Siyuan ;
Liu, Pei ;
Li, Zheng .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2020, 130
[7]   Optimal Planning of Multi-Energy System Considering Thermal Storage Capacity of Heating Network and Heat Load [J].
Cheng, Hongzhong ;
Wu, Jian ;
Luo, Zhao ;
Zhou, Fei ;
Liu, Xinglin ;
Lu, Tao .
IEEE ACCESS, 2019, 7 :13364-13372
[8]   Planning multiple energy systems for low-carbon districts with high penetration of renewable energy: An empirical study in China [J].
Cheng, Yaohua ;
Zhang, Ning ;
Kirschen, Daniel S. ;
Huang, Wujing ;
Kang, Chongqing .
APPLIED ENERGY, 2020, 261
[9]   Modeling, planning and optimal energy management of combined cooling, heating and power microgrid: A review [J].
Gu, Wei ;
Wu, Zhi ;
Bo, Rui ;
Liu, Wei ;
Zhou, Gan ;
Chen, Wu ;
Wu, Zaijun .
INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2014, 54 :26-37
[10]   Robust Co-Optimization Planning of Interdependent Electricity and Natural Gas Systems With a Joint N-1 and Probabilistic Reliability Criterion [J].
He, Chuan ;
Wu, Lei ;
Liu, Tianqi ;
Bie, Zhaohong .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2018, 33 (02) :2140-2154