Investment in production resource flexibility: An empirical investigation of methods for planning under uncertainty

被引:4
作者
Katok, E [1 ]
Tarantino, W
Harrison, TP
机构
[1] Penn State Univ, MS&IS Dept, University Pk, PA 16802 USA
[2] Ctr Army Anal, Ft Belvoir, VA USA
关键词
manufacturing flexibility; stochastic programming; sampling;
D O I
10.1002/nav.10059
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We examine several methods for evaluating resource acquisition decisions under uncertainty. Traditional methods may underestimate equipment benefit when part of this benefit comes from decision flexibility. We develop a new, practical method for resource planning under uncertainty, and show that this approach is more accurate than several commonly used methods. We successfully applied our approach to an investment problem faced by a major firm in the aviation information industry. Our recommendations were accepted and resulted in estimated annual savings in excess of $1 million (US). (C) 2003 Wiley Periodicals, Inc.
引用
收藏
页码:105 / 129
页数:25
相关论文
共 30 条
[1]   MEASURING THE ECONOMIC EFFECTIVENESS OF FLEXIBLE AUTOMATION - A NEW APPROACH [J].
AZZONE, G ;
BERTELE, U .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (05) :735-746
[2]   THE STRATEGIC VALUE OF FLEXIBILITY IN SEQUENTIAL DECISION-MAKING [J].
BENJAAFAR, S ;
MORIN, TL ;
TALAVAGE, JJ .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 82 (03) :438-457
[3]  
Birge J. R., 1997, INTRO STOCHASTIC PRO
[4]   DETERMINISTIC APPROXIMATIONS TO STOCHASTIC PRODUCTION PROBLEMS [J].
BITRAN, GR ;
YANASSE, HH .
OPERATIONS RESEARCH, 1984, 32 (05) :999-1018
[5]   ON UPPER-BOUNDS OF SEQUENTIAL STOCHASTIC PRODUCTION PLANNING PROBLEMS [J].
BITRAN, GR ;
SARKAR, D .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 34 (02) :191-207
[6]   THE RUSSELL-YASUDA KASIA MODEL - AN ASSET LIABILITY MODEL FOR A JAPANESE INSURANCE COMPANY USING MULTISTAGE STOCHASTIC-PROGRAMMING [J].
CARINO, DR ;
KENT, T ;
MYERS, DH ;
STACY, C ;
SYLVANUS, M ;
TURNER, AL ;
WATANABE, K ;
ZIEMBA, WT .
INTERFACES, 1994, 24 (01) :29-49
[7]   INVESTIGATIONS INTO THE IMPACT OF FLEXIBILITY ON MANUFACTURING PERFORMANCE [J].
DAS, SK ;
NAGENDRA, P .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (10) :2337-2354
[8]   THE FLEXIBILITY OF PRODUCTION PROCESSES - A GENERAL FRAMEWORK [J].
DEGROOTE, X .
MANAGEMENT SCIENCE, 1994, 40 (07) :933-945
[9]  
Dembo R. S., 1991, ANN OPER RES, V30, P63, DOI DOI 10.1007/BF02204809
[10]   A SCENARIO APPROACH TO CAPACITY PLANNING [J].
EPPEN, GD ;
MARTIN, RK ;
SCHRAGE, L .
OPERATIONS RESEARCH, 1989, 37 (04) :517-527