Interval optimization based operating strategy for gas-electricity integrated energy systems considering demand response and wind uncertainty

被引:321
作者
Bai, Linquan [1 ]
Li, Fangxing [1 ]
Cui, Hantao [1 ]
Jiang, Tao [2 ]
Sun, Hongbin [3 ]
Zhu, Jinxiang [4 ]
机构
[1] Univ Tennessee, Dept Elect & Comp Engn, Knoxville, TN 37996 USA
[2] Northeast Dianli Univ, Sch Elect Engn, Changchun, Jilin, Peoples R China
[3] Tsinghua Univ, Beijing 100084, Peoples R China
[4] ABB Inc, Grid Syst Consulting, Raleigh, NC USA
关键词
Coordinated operation; Demand response; Gas and electricity network; Integrated energy systems; Interval optimization; Wind power uncertainty; ROBUST UNIT COMMITMENT; NATURAL-GAS; RENEWABLE ENERGY; POWER; NETWORK; MODEL;
D O I
10.1016/j.apenergy.2015.10.119
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
In the United States, natural gas-fired generators gained increasing popularity in recent years due to the low fuel cost and emission, as well as the proven large gas reserves. Consequently, the highly interdependency between the gas and electricity networks is needed to be considered in the system operation. To improve the overall system operation and optimize the energy flow, an interval optimization based coordinated operating strategy for the gas-electricity integrated energy system (IES) is proposed in this paper considering demand response and wind power uncertainty. In the proposed model, the gas and electricity infrastructures are modeled in detail and their operation constraints are fully considered, wherein the nonlinear characteristics are modeled including pipeline gas flow and compressors. Then a demand response program is incorporated into the optimization model and its effects on the IES operation are investigated. Based on interval mathematics, wind power uncertainty is represented as interval numbers instead of probability distributions. A case study is performed on a six-bus electricity network with a seven-node gas network to demonstrate the effectiveness of the proposed method; further, the IEEE 118-bus system coupling with a 14-node natural gas system is used to verify its applicability in practical bulk systems. (C) 2015 Elsevier Ltd. All rights reserved.
引用
收藏
页码:270 / 279
页数:10
相关论文
共 32 条
[1]   Natural gas and electricity optimal power flow [J].
An, S ;
Li, Q ;
Gedra, TW .
2003 IEEE PES TRANSMISSION AND DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3, CONFERENCE PROCEEDINGS: BLAZING TRAILS IN ENERGY DELIVERY AND SERVICES, 2003, :138-143
[2]   Exploring the Modeling Capacity of Two-Stage Robust Optimization: Variants of Robust Unit Commitment Model [J].
An, Yu ;
Zeng, Bo .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2015, 30 (01) :109-122
[3]  
[Anonymous], 2010, Annual Energy Review
[4]   Combined gas and electricity network expansion planning [J].
Chaudry, Modassar ;
Jenkins, Nick ;
Qadrdan, Meysam ;
Wu, Jianzhong .
APPLIED ENERGY, 2014, 113 :1171-1187
[5]   Security-Constrained Optimal Power and Natural-Gas Flow [J].
Correa-Posada, Carlos M. ;
Sanchez-Martin, Pedro .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2014, 29 (04) :1780-1787
[6]  
Dobschinski J., 2008, P GERM WIND EN C DEW
[7]   A GRAY FUZZY LINEAR-PROGRAMMING APPROACH FOR MUNICIPAL SOLID-WASTE MANAGEMENT PLANNING UNDER UNCERTAINTY [J].
HUANG, GH ;
BAETZ, BW ;
PATRY, GG .
CIVIL ENGINEERING SYSTEMS, 1993, 10 (02) :123-146
[8]   Modeling Dynamic Demand Response Using Monte Carlo Simulation and Interval Mathematics for Boundary Estimation [J].
Huang, Hao ;
Li, Fangxing ;
Mishra, Yateendra .
IEEE TRANSACTIONS ON SMART GRID, 2015, 6 (06) :2704-2713
[9]  
ISO-NE, 2014, NEW ENGL GAS EL FOC
[10]   Robust Unit Commitment With Wind Power and Pumped Storage Hydro [J].
Jiang, Ruiwei ;
Wang, Jianhui ;
Guan, Yongpei .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (02) :800-810