A note on a well-known dispatching rule to minimize total tardiness

被引:12
作者
Naidu, JT [1 ]
机构
[1] Philadelphia Univ, Sch Business Adm, Philadelphia, PA 19144 USA
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2003年 / 31卷 / 02期
关键词
scheduling; single machine; tardiness; optimality; heuristics;
D O I
10.1016/S0305-0483(03)00020-3
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The single machine tardiness problem is considered. We clarify and correct an earlier result related to the Modified Due Date (MDD) Rule of Baker and Bertrand and show that a heuristic does not always satisfy an optimal sequence. However, we present some interesting special cases of optimal sequences that do satisfy the MDD Rule. We believe this note is important because the MDD Rule is still considered to be one of the most efficient rules to minimize the single machine tardiness problem. Because of its dispatching nature and simplicity, the MDD Rule is found to be very practical. It is widely applied in both static and dynamic job shop and industrial settings where setup times if any are negligible or included in the job processing times and hence not an issue. (C) 2003 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:137 / 140
页数:4
相关论文
共 11 条
[1]   A note on the equivalence of two heuristics to minimize total tardiness [J].
Alidaee, B ;
Gopalan, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 96 (03) :514-517
[2]  
BAKER KR, 1982, J OPER MANAG, V3, P37, DOI DOI 10.1016/0272-6963(82)90020-1
[3]   MINIMIZING TOTAL TARDINESS ON ONE MACHINE IS NP-HARD [J].
DU, JZ ;
LEUNG, JYT .
MATHEMATICS OF OPERATIONS RESEARCH, 1990, 15 (03) :483-495
[4]   ONE-MACHINE SEQUENCING TO MINIMIZE CERTAIN FUNCTIONS OF JOB TARDINESS [J].
EMMONS, H .
OPERATIONS RESEARCH, 1969, 17 (04) :701-&
[5]  
HOLSENBACK JE, 1992, J OPER RES SOC, V43, P53
[6]   THE TOTAL TARDINESS PROBLEM - REVIEW AND EXTENSIONS [J].
KOULAMAS, C .
OPERATIONS RESEARCH, 1994, 42 (06) :1025-1041
[7]  
Lawler E. L., 1977, ANN DISCRETE MATH, V1, P331, DOI [DOI 10.1016/S0167-5060(08)70742-8, 10.1016/S0167-5060(08)70742-8]
[8]   A HEURISTIC FOR THE SINGLE-MACHINE TARDINESS PROBLEM [J].
PANWALKAR, SS ;
SMITH, ML ;
KOULAMAS, CP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1993, 70 (03) :304-310
[9]  
Potts C. N., 1982, Operations Research Letters, V1, P177, DOI 10.1016/0167-6377(82)90035-9
[10]  
RACHAMADUGU RV, 1987, OPER RES, V3, P450