Large-scale model test for studying the water inrush during tunnel excavation in fault

被引:29
作者
Wang, Yingchao [1 ,2 ,5 ]
Chen, Fan [1 ]
Sui, Wanghua [1 ]
Meng, Fanshu [3 ]
Geng, Fan [4 ]
机构
[1] China Univ Min & Technol, State Key Lab Geomech & Deep Underground Engn, Xuzhou 221116, Jiangsu, Peoples R China
[2] China Univ Min & Technol, Sch Mech & Civil Engn, Xuzhou 221116, Jiangsu, Peoples R China
[3] Shanghai Baoye Grp Corp LTD, Shanghai 200941, Peoples R China
[4] China Univ Min & Technol, Sch Elect & Power Engn, Xuzhou 221116, Jiangsu, Peoples R China
[5] Chinese Acad Sci, State Key Lab Geomech & Geotech Engn, Wuhan 430071, Peoples R China
基金
中国国家自然科学基金;
关键词
Tunnel engineering; Model test; Water-rich fault; Water inrush; Water-resistant strata;
D O I
10.1007/s10064-022-02733-9
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Water-rich fault fracture zone is one of the main factors leading to water and mud inrush in tunnels, which has attracted wide attention of scholars. In order to investigate the fracture and water inrush mechanism of fault surrounding rock under the disturbance of tunnel excavation and water pressure, taking Qilian Mountain Tunnel as engineering background, the fracture of fault surrounding rock caused by tunnel excavation is studied based on the self-developed model test apparatus. The model test system was comprised of a water supply system, acrylic glass holding device, and collection system. The experiment smoothly and successfully reproduced the process of water inrush in front of the tunnel face caused by excavation unloading and water pressure, and the deforming performance and stress distribution of surrounding rock were investigated. According to the experimental phenomena and data analysis, the process of water inrush could be divided into three stages. In the first stage, the tunnel face changed from dry to wet with the tunnel excavation, and the water pressure, soil pressure, and displacement of monitoring points were nearly unchanged. In the second stage, the water seepage area spread to the whole tunnel face from the bottom, and finally water inrush occurred. And the water pressure and soil pressure of monitoring points were increased significantly. At the moment of water inrush, the displacement of monitoring point in fault increased instantaneously; the water-resistant strata have obvious instability characteristics. In the third stage, the water inflow and sand inflow become fewer and fewer over time. And the seepage pressure and soil pressure of monitoring points on the right side of the tunnel decrease firstly and then increase, while the seepage pressure and soil pressure of monitoring points on the left side of the tunnel decrease sharply. The results provide a valuable reference for the mechanism research of water inrush.
引用
收藏
页数:11
相关论文
共 22 条
[1]   Experimental and CFD Analysis of Circular Labyrinth Weirs [J].
Bilhan, Omer ;
Aydin, M. Cihan ;
Emiroglu, M. Emin ;
Miller, Carol J. .
JOURNAL OF IRRIGATION AND DRAINAGE ENGINEERING, 2018, 144 (06)
[2]  
Chen YA.\, 2018, RAILWAY STANDARD DES, V62, P109
[3]   Model test and numerical simulation research of water leakage in operating tunnels passing through intersecting faults [J].
Gao, Cheng-lu ;
Zhou, Zong-qing ;
Yang, Wei-min ;
Lin, Chun-jin ;
Lia, Li-ping ;
Wang, Jing .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2019, 94
[4]   Using the Schwarz Alternating Method to Identify Critical Water-Resistant Thickness between Tunnel and Concealed Cavity [J].
Guo, Jiaqi ;
Chen, Jianxun ;
Chen, Fan ;
Huang, Shanxiu ;
Wang, Hongyu .
ADVANCES IN CIVIL ENGINEERING, 2018, 2018
[5]   Development and Application of the 3D Model Test System for Water and Mud Inrush of Water-Rich Fault Fracture Zone in Deep Tunnels [J].
Guo, Yanhui ;
Kong, Zhijun ;
He, Jin ;
Yan, Ming .
MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021 (2021)
[6]  
HE Zhen-ning, 2016, Tunnel Construction, V36, P636
[7]  
Huang M, 2012, DISASTER ADV, V5, P1680
[8]   Model test to investigate waterproof-resistant slab minimum safety thickness for water inrush geohazards [J].
Jiang, Hai-ming ;
Li, Lang ;
Rong, Xiao-li ;
Wang, Ming-yang ;
Xia, Yuan-pu ;
Zhang, Zhi-cheng .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2017, 62 :35-42
[9]  
Jing HW, 2019, Hazard Control Tunn Undergr Eng, V1, P102
[10]   Model test study on surrounding rock deformation and failure mechanisms of deep roadways with thick top coal [J].
Li, S. C. ;
Wang, Q. ;
Wang, H. T. ;
Jiang, B. ;
Wang, D. C. ;
Zhang, B. ;
Li, Y. ;
Ruan, G. Q. .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2015, 47 :52-63