PROJECT RISK EVALUATION BY USING A NEW FUZZY MODEL BASED ON ELENA GUIDELINE

被引:22
作者
Asadi, Pezhman [1 ]
Rezaeian Zeidi, Javad [2 ]
Mojibi, Toraj [3 ]
Yazdani-Chamzini, Abdolreza [4 ]
Tamosaitiene, Jolanta [5 ]
机构
[1] Islamic Azad Univ, Dept Execut Management, Fac Management, Firuzkouh Branch, Tehran, Iran
[2] Mazandaran Univ Sci & Technol, Dept Ind Engn, Mazandaran, Iran
[3] Islamic Azad Univ, Dept Management, Firuzkouh Branch, Tehran, Iran
[4] Islamic Azad Univ, South Tehran Branch, Young Researchers & Elite Club, Tehran, Iran
[5] Vilnius Gediminas Tech Univ, Fac Civil Engn, Sauletekio Al 11, LT-10223 Vilnius, Lithuania
关键词
project risk evaluation; Rah Costar Naft Company; fuzzy inference system; Elena guideline; ANALYTIC HIERARCHY PROCESS; CONSTRUCTION PROJECTS; INFERENCE SYSTEM; OCCUPATIONAL-HEALTH; MANAGEMENT; METHODOLOGY; ENVIRONMENT; IMPACT; SAFETY;
D O I
10.3846/jcem.2018.3070
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The complexity and dynamics of the executive projects have coped contractors with substantial hazards and losses. Project risk management is a critical tool for authority to improve its performance and secure the success of the organization. However, a number of standards and approaches have been developed to formulate the projects based on their risks. The Elena guideline is a systematic standard developed by Iran Project Management Association. This guideline provides the full cycle of the risk management process. Risk evaluation is the key part of the risk management process. On the other hand, different techniques have been developed to model a risk evaluation problem. Fuzzy inference system is one of the most popular techniques that is capable of handling all types of the uncertainty involved in projects. This paper proposes a three-stage approach based on the fuzzy inference system under the environment of the Elena guideline to cope with the risky projects. Finally, an illustrative example of the risk evaluation is presented to demonstrate the potential application of the proposed model. The results show that the proposed model evaluates the risky projects efficiently and effectively.
引用
收藏
页码:284 / 300
页数:17
相关论文
共 63 条
[1]  
Akintoye A.S., 1997, INT J PROJ MANAG, V15, P31, DOI [DOI 10.1016/S0263-7863(96)00035-X, https://doi.org/10.1016/S0263-7863(96)00035-X]
[2]  
[Anonymous], 5 INT C CONSTR 21 CE
[3]  
[Anonymous], 2001, 62198 IEC
[4]  
[Anonymous], 2004, 4360 RISK MAN
[5]  
[Anonymous], 2007, P CIB WORLD BUILD C
[6]   Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation [J].
Badri, Adel ;
Nadeau, Sylvie ;
Gbodossou, Andre .
ACCIDENT ANALYSIS AND PREVENTION, 2012, 48 :223-234
[7]  
Carbone T.A., 2004, ENG MANAG J, V16, P28, DOI 10.1080/10429247.2004.11415263
[8]  
Chapman C.B., 1997, INT J PROJ MANAG, V15, P273, DOI [DOI 10.1016/S0263-7863(96)00079-8, 10.1016/S0263-7863(96)00079-8]
[9]  
Chapman C.B., 1990, International Journal of Project Management, P5, DOI [10.1016/0263-7863(90)90003-T, DOI 10.1016/0263-7863(90)90003-T]
[10]  
Chapman R., 2014, The rules of project risk management: Implementation guidelines for major projects