A decision support system for fuzzy scheduling of software projects

被引:5
|
作者
Sanal, UZ [1 ]
机构
[1] HAVELSAN AS, TR-065201 Ankara, Turkey
来源
AUTOTESTCON 2000: IEEE SYSTEMS READINESS TECHNOLOGY CONFERENCE, PROCEEDINGS | 2000年
关键词
D O I
10.1109/AUTEST.2000.885602
中图分类号
V [航空、航天];
学科分类号
08 ; 0825 ;
摘要
In this study, a fuzzy project scheduling decision support system applied to a real world software development project is presented. The purpose of the project scheduling system is to allocate resources (engineers with different skill and experience levels) to activities with different complexity levels and uncertain durations. The activities are nonpreemptive in nature and there are no strict precedence relationships between them. The activity durations are modeled by fuzzy numbers as a function of the skill level of the resource allocated to that activity and the complexity level of the activity. Skill and complexity levels are also represented by fuzzy numbers. The objective of the scheduling of activities is the minimization of the project completion time. In scheduling three heuristic scheduling rules are utilized These scheduling rules are presented with their applications on sample problems derived from a particular software development project The decision support system carries the task of organizing the input data entry for scheduling, the generation of the schedule, and the presentation of the results to the user.
引用
收藏
页码:263 / 272
页数:10
相关论文
共 50 条
  • [1] Decision support system for scheduling steel fabrication projects
    Karumanasseri, G
    AbouRizk, S
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (05): : 392 - 399
  • [2] An intelligent fuzzy decision support system for scheduling of FMS
    Kazerooni, A
    Chan, FTS
    Abhary, K
    Pun, F
    CAD/CAM ROBOTICS AND FACTORIES OF THE FUTURE, 1996, : 400 - 409
  • [3] Application of the integrated decision support system for scheduling of development projects
    Berezka, Vitaly
    VI INTERNATIONAL SCIENTIFIC CONFERENCE INTEGRATION, PARTNERSHIP AND INNOVATION IN CONSTRUCTION SCIENCE AND EDUCATION (IPICSE-2018), 2018, 251
  • [4] An intelligent fuzzy agent for meeting scheduling decision support system
    Lee, CS
    Pan, CY
    FUZZY SETS AND SYSTEMS, 2004, 142 (03) : 467 - 488
  • [5] Decision aid for the selection and scheduling of software maintenance projects
    State Univ of New York at Albany, Albany, United States
    IEEE Trans Syst Man Cybern Pt A Syst Humans, 2 (203-212):
  • [6] A decision aid for the selection and scheduling of software maintenance projects
    Ballou, DP
    Tayi, GK
    IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS, 1996, 26 (02): : 203 - 212
  • [7] Fuzzy Logic Based Decision Support System Framework for Irrigation Scheduling
    Patel, Jignesh
    Patel, Himanshu
    Bhatt, Chetan
    3RD NIRMA UNIVERSITY INTERNATIONAL CONFERENCE ON ENGINEERING (NUICONE 2012), 2012,
  • [8] An Intelligent Recommender and Decision Support System (IRDSS) for Effective Management of Software Projects
    Hamid, Muhammad
    Zeshan, Furkh
    Ahmad, Adnan
    Ahmad, Farooq
    Hamza, Muhammad Ali
    Khan, Zuhaib Ashfaq
    Munawar, Saima
    Aljuaid, Hanan
    IEEE ACCESS, 2020, 8 : 140752 - 140766
  • [9] DEVELOPING A SOFTWARE FOR FUZZY GROUP DECISION SUPPORT SYSTEM: A CASE STUDY
    Baba, A. Fevzi
    Kuscu, Dincer
    Han, Kerem
    TURKISH ONLINE JOURNAL OF EDUCATIONAL TECHNOLOGY, 2009, 8 (03): : 22 - 29
  • [10] Fuzzy-logic-based decision support system for scheduling tillage operations
    Thangavadivelu, S
    Colvin, TS
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 1997, 10 (05) : 463 - 472