共 82 条
[64]
Weise T, 2009, STUD COMPUT INTELL, V193, P1
[66]
An Efficient PSO Algorithm for Finding Pareto-Frontier in Multi-Objective Job Shop Scheduling Problems
[J].
INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS,
2013, 12 (02)
:151-160
[67]
Wright AH., 1991, FDN GENETIC ALGORITH, V1, P205, DOI DOI 10.1016/B978-0-08-050684-5.50016-1
[68]
Multi-Objective Flexible Flow Shop Scheduling Problem Considering Variable Processing Time due to Renewable Energy
[J].
SUSTAINABILITY,
2018, 10 (03)