Maintenance Optimization Based on Three-Stage Failure Process under Performance-Based Contracting

被引:2
作者
Zhu, Xi [1 ]
Zhao, Fei [1 ,2 ]
Li, Juan [1 ]
Bai, Yongsheng [1 ]
Hu, Qiwei [1 ]
机构
[1] Army Engn Univ PLA, Equipment Command & Management Dept, Shijiazhuang 050003, Hebei, Peoples R China
[2] Northeastern Univ, Sch Business Adm, Shenyang 110819, Peoples R China
基金
中国国家自然科学基金;
关键词
SERVICE CONTRACTS; DEFENSE INDUSTRY; SPARE PARTS; LOGISTICS; POLICY; SYSTEMS; MODEL; RELIABILITY; MANAGEMENT; ISSUES;
D O I
10.1155/2021/6323844
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
As a new form of support contract, performance-based contracting has been extensively applied in both public and private sectors. However, maintenance policies under performance-based contracting have not gotten enough attention. In this paper, a preventive maintenance optimization model based on three-stage failure process for a single-component system is investigated with an objective of maximizing the profit and improving system performance at a lower cost under performance-based contracting. Different from conventional optimization models, the step revenue function is used to correlate profit with availability and cost. Then, a maintenance optimization model is proposed to maximize profit by optimizing the inspection interval. Moreover, the customers' upper limit of funds is considered when we use the revenue function, which has rarely been considered in past studies. Finally, a case study on the cold water pumps along with comparison of linear and step revenue function and sensitivity analysis is provided to illustrate the applicability and effectiveness of our proposed approach.
引用
收藏
页数:14
相关论文
共 49 条
  • [31] Effective management of performance-based contracts for sustainment dominant systems
    Patra, Pradipta
    Kumar, U. Dinesh
    Nowicki, David R.
    Randall, Wesley S.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2019, 208 : 369 - 382
  • [32] Inventory optimization for a customer airline in a Performance Based Contract
    Patriarca, Riccardo
    Costantino, Francesco
    Di Gravio, Giulio
    Tronci, Massimo
    [J]. JOURNAL OF AIR TRANSPORT MANAGEMENT, 2016, 57 : 206 - 216
  • [33] Optimal maintenance policy considering maintenance errors for systems operating under performance-based contracts
    Qiu, Qingan
    Cui, Lirong
    Shen, Jingyuan
    Yang, Li
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2017, 112 : 147 - 155
  • [34] Explaining the effectiveness of performance-based logistics: a quantitative examination
    Randall, Wesley S.
    Nowicki, David R.
    Hawkins, Timothy G.
    [J]. INTERNATIONAL JOURNAL OF LOGISTICS MANAGEMENT, 2011, 22 (03) : 324 - 348
  • [35] Valuation of performance-based contracts for capital equipment: A stochastic programming approach
    Sharifi, Mohammadreza
    Kwon, Roy H.
    Jardine, Andrew K. S.
    [J]. ENGINEERING ECONOMIST, 2016, 61 (01) : 1 - 22
  • [36] Smith S.J., 2007, EQUIPPING AM FORCES
  • [37] Defining the fundamental framework of an effective Performance-Based Logistics (PBL) contract
    Sols, Alberto
    Nowick, David
    Verma, Dinesh
    [J]. ENGINEERING MANAGEMENT JOURNAL, 2007, 19 (02) : 40 - 50
  • [38] United States Department of Defense, 2016, PERF BAS LOG PBL GUI PERF BAS LOG PBL GUI
  • [39] Optimizing wind turbine's maintenance policies under performance-based contract
    Wang, Jingjing
    Zhao, Xian
    Guo, Xiaoxin
    [J]. RENEWABLE ENERGY, 2019, 135 : 626 - 634
  • [40] On the application of a model of condition-based maintenance
    Wang, W
    Scarf, PA
    Smith, MAJ
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2000, 51 (11) : 1218 - 1227