Maintenance Optimization Based on Three-Stage Failure Process under Performance-Based Contracting

被引:2
作者
Zhu, Xi [1 ]
Zhao, Fei [1 ,2 ]
Li, Juan [1 ]
Bai, Yongsheng [1 ]
Hu, Qiwei [1 ]
机构
[1] Army Engn Univ PLA, Equipment Command & Management Dept, Shijiazhuang 050003, Hebei, Peoples R China
[2] Northeastern Univ, Sch Business Adm, Shenyang 110819, Peoples R China
基金
中国国家自然科学基金;
关键词
SERVICE CONTRACTS; DEFENSE INDUSTRY; SPARE PARTS; LOGISTICS; POLICY; SYSTEMS; MODEL; RELIABILITY; MANAGEMENT; ISSUES;
D O I
10.1155/2021/6323844
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
As a new form of support contract, performance-based contracting has been extensively applied in both public and private sectors. However, maintenance policies under performance-based contracting have not gotten enough attention. In this paper, a preventive maintenance optimization model based on three-stage failure process for a single-component system is investigated with an objective of maximizing the profit and improving system performance at a lower cost under performance-based contracting. Different from conventional optimization models, the step revenue function is used to correlate profit with availability and cost. Then, a maintenance optimization model is proposed to maximize profit by optimizing the inspection interval. Moreover, the customers' upper limit of funds is considered when we use the revenue function, which has rarely been considered in past studies. Finally, a case study on the cold water pumps along with comparison of linear and step revenue function and sensitivity analysis is provided to illustrate the applicability and effectiveness of our proposed approach.
引用
收藏
页数:14
相关论文
共 49 条
  • [1] Christer A.H., 1976, Proceedings of the NATO conference on the role and effectiveness of theories of decision in practice, P368
  • [2] DELAY TIME MODELS OF INDUSTRIAL INSPECTION MAINTENANCE PROBLEMS
    CHRISTER, AH
    WALLER, WM
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1984, 35 (05) : 401 - 406
  • [3] Sequential inspection strategy for multiple systems under availability requirement
    Cui, LR
    Loh, HT
    Xie, M
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 155 (01) : 170 - 177
  • [4] Incentive issues in performance-based outsourcing contracts in the UK defence industry: a simulation study
    Datta, Partha Priya
    Roy, Rajkumar
    [J]. PRODUCTION PLANNING & CONTROL, 2013, 24 (4-5) : 359 - 374
  • [5] A review on maintenance optimization
    de Jonge, Bram
    Scarf, Philip A.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 285 (03) : 805 - 824
  • [6] MEASUREMENT ISSUES IN PERFORMANCE-BASED LOGISTICS
    Doerr, Kenneth
    Lewis, Ira
    Eaton, Donald R.
    [J]. JOURNAL OF PUBLIC PROCUREMENT, 2005, 5 (02) : 164 - 186
  • [7] Performance-based contracting in business markets
    Essig, Michael
    Glas, Andreas H.
    Selviaridis, Kostas
    Roehrich, Jens K.
    [J]. INDUSTRIAL MARKETING MANAGEMENT, 2016, 59 : 5 - 11
  • [8] Performance-based logistics: a portfolio for contracting military supply
    Glas, Andreas
    Hofmann, Erik
    Essig, Michael
    [J]. INTERNATIONAL JOURNAL OF PHYSICAL DISTRIBUTION & LOGISTICS MANAGEMENT, 2013, 43 (02) : 97 - 115
  • [9] A condition-based maintenance policy for stochastically deteriorating systems
    Grall, A
    Bérenguer, C
    Dieulle, L
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2002, 76 (02) : 167 - 180
  • [10] Investigating risks of outcome-based service contracts from a provider's perspective
    Hou, Jingchen
    Neely, Andy
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (06) : 2103 - 2115