Hybrid Simulation-Based Optimization for Production Planning of a Dedicated Remanufacturing System

被引:3
作者
Chiadamrong, Navee [1 ]
Tangchaisuk, Chayanan [1 ]
机构
[1] Thammasat Univ, Sirindhorn Int Inst Technol, Khlong Luang Dist, Pathum Thani, Thailand
关键词
Genetic Algorithm; Hybrid Simulation-Based Optimization; Particle Swarm Optimization; Production Planning; Remanufacturing System; PARTICLE SWARM OPTIMIZATION; GENETIC ALGORITHM; STRATEGIES; MODEL; COST;
D O I
10.4018/IJKSS.2021070103
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper presents a comparative simulation study of a dedicated remanufacturing system. The production line of a dedicated remanufacturing system producing multiple products under uncertain environment is improved through the simulation-based optimization approach. Appropriate inventory capacity of buffers, a proper switching rule, and a suitable run size of each product should be optimally set to yield the highest system's profit. Then, hybrid simulation-based optimization algorithms with two hybrid optimization forms using a Genetic Algorithm (GA) and Particle Swarm Optimization (PSO) as complementary to each other in relation to their standard algorithms are proposed and compared. A case study is used to demonstrate and compare the performances among the algorithms to show the advantages of the proposed algorithms. This approach can assist in decision making for the planning and management of dedicated remanufacturing systems that are required to operate with various decision variables under uncertainties.
引用
收藏
页码:53 / 79
页数:27
相关论文
共 50 条
[41]   Performance analysis of simulation-based optimization of construction projects using High Performance Computing [J].
Salimi, Shide ;
Mawlana, Mohammed ;
Hammad, Amin .
AUTOMATION IN CONSTRUCTION, 2018, 87 :158-172
[42]   A simulation-based optimization method for designing energy efficient buildings [J].
Yigit, Sadik ;
Ozorhon, Beliz .
ENERGY AND BUILDINGS, 2018, 178 :216-227
[43]   Production scheduling optimization method based on hybrid particle swarm optimization algorithm [J].
Shang, Jianren ;
Tian, Yunnan ;
Liu, Yi ;
Liu, Runlong .
JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2018, 34 (02) :955-964
[44]   Using workflow for reconfigurable simulation-based planning and scheduling system [J].
Lee, Ho Yeoul ;
Choi, Byoung Kyu .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2011, 24 (02) :171-187
[45]   OPTIMIZATION AND SIMULATION OF REMANUFACTURING PRODUCTION SCHEDULING UNDER UNCERTAINTIES [J].
He, P. .
INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2018, 17 (04) :734-743
[46]   Development of a simulation-based optimization approach to integrate the decisions of maintenance planning and safety stock determination in deteriorating manufacturing systems [J].
Hadian, Seyed Mohammad ;
Farughi, Hiwa ;
Rasay, Hasan .
COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 178
[47]   Simulation-based Production Planning and Execution Control for Reconfigurable Assembly Cells [J].
Gyulai, David ;
Pfeiffer, Andras ;
Kadar, Botond ;
Monostori, Laszlo .
FACTORIES OF THE FUTURE IN THE DIGITAL ENVIRONMENT, 2016, 57 :445-450
[48]   A simulation-based optimization approach for a semiconductor photobay with automated material handling system [J].
Lin, James T. ;
Huang, Chao-Jung .
SIMULATION MODELLING PRACTICE AND THEORY, 2014, 46 :76-100
[49]   Simulation-based design and optimization of refrigeration cassettes [J].
Waltrich, Maicon ;
Hermes, Christian J. L. ;
Melo, Claudio .
APPLIED ENERGY, 2011, 88 (12) :4756-4765
[50]   Simulation-based vehicular traffic lights optimization [J].
Panovski, Dancho ;
Zaharia, Titus .
2016 12TH INTERNATIONAL CONFERENCE ON SIGNAL-IMAGE TECHNOLOGY & INTERNET-BASED SYSTEMS (SITIS), 2016, :258-265