共 50 条
[33]
Techno-economic assessment of carbon mitigation options for existing coal-fired power plants in India
[J].
5TH INTERNATIONAL CONFERENCE ON ADVANCES IN ENERGY RESEARCH (ICAER) 2015,
2016, 90
:326-335
[35]
Techno-economic Assessment of Flexible Solvent Regeneration & Storage for Base Load Coal-Fired Power Generation with Post Combustion CO2 Capture
[J].
10TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES,
2011, 4
:2612-2619
[38]
On the flexibility of coal-fired power plants with integrated Ca-looping CO2 capture process
[J].
13TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, GHGT-13,
2017, 114
:6552-6562
[40]
CO2 CAPTURE AND ITS INFLUENCE ON ENERGY AND ECONOMIC EFFICIENCY OF A COAL FIRED POWER PLANT
[J].
ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL,
2015, 14 (04)
:925-934