Techno-economic evaluation of using biomass-fired auxiliary units for supplying energy requirements of CO2 capture in coal-fired power plants

被引:17
|
作者
Khorshidi, Zakieh [1 ]
Ho, Minh T. [1 ]
Wiley, Dianne E. [1 ]
机构
[1] UNSW Australia, Sch Chem Engn, Cooperat Res Ctr Greenhouse Gas Technol CO2CRC, Sydney, NSW 2052, Australia
关键词
Biomass; Auxiliary unit; Coal-fired plants; CO2; capture; Carbon price; Renewable energy certificates; POSTCOMBUSTION CARBON CAPTURE; FOSSIL; COST; TECHNOLOGIES; PERFORMANCE; INTEGRATION; GENERATION; ABSORPTION;
D O I
10.1016/j.ijggc.2014.10.017
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Parasitically providing the energy required for CO2 capture from retrofitted coal power plants can lead to a significant loss in output of electricity. In this study, different configurations of auxiliary units are investigated to partially or totally meet the energy requirements for MEA post-combustion capture in a 500 MW sub-critical coal-fired plant. The auxiliary unit is either a boiler, providing only the heat required for solvent regeneration in the capture process or a combined heat and power (CHP) unit, providing both heat and electricity. Using biomass in auxiliary units, the grid loss is reduced without increasing fossil fuel consumption. The results show that using a biomass CHP unit is more favourable than using a biomass boiler both in terms of CO2 emission reductions and power plant economic viability. By using an auxiliary biomass CHP unit, both the emission intensity and the cost of electricity would be marginally lower than for a coal plant with capture. Further emission reductions occur if CO2 is captured both from the coal plant and the auxiliary biomass CHP, resulting in negative emissions. However, high incentive schemes (a carbon price higher than 55 $/t CO2 or a combination of lower carbon price and renewable energy certificates) or a low biomass price (lower than 1 $/GJ) are required to make CO2 capture from both the coal plant and the auxiliary biomass CHP unit economically attractive. All cost comparisons are for CO2 capture only and CO2 transport and storage are not included in this study. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:24 / 36
页数:13
相关论文
共 50 条
  • [1] Techno-Economic Evaluation of Biomass Fired or Co-Fired Power Plants with Post Combustion CO2 Capture
    Domenichini, Rosa
    Gasparini, Franco
    Cotone, Paolo
    Santos, Stanley
    10TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, 2011, 4 : 1851 - 1860
  • [2] Techno-Economic Analysis of CO2 Capture Processes from Coal-fired Power Plants
    Yun, Seokwon
    Lee, Sunghoon
    Kim, Jin-Kuk
    28TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2018, 43 : 1519 - 1520
  • [3] Techno-economic study of biomass co-firing with and without CO2 capture in an Australian black coal-fired power plant
    Khorshidi, Zakieh
    Ho, Minh T.
    Wiley, Dianne E.
    GHGT-11, 2013, 37 : 6035 - 6042
  • [4] Techno-economic feasibility assessment of CO2 capture from coal-fired power plants using molecularly imprinted polymer
    Hanak, Dawid P.
    Manovic, Vasilije
    FUEL, 2018, 214 : 512 - 520
  • [5] Techno-Economic Assessment of Polymer Membrane Systems for Postcombustion Carbon Capture at Coal-Fired Power Plants
    Zhai, Haibo
    Rubin, Edward S.
    ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2013, 47 (06) : 3006 - 3014
  • [6] Energy and Economic Assessment of Oxy-Fuel Combustion CO2 Capture in Coal-Fired Power Plants
    Yuan, Yuyang
    Wang, Lei
    Zhuang, Yaming
    Wu, Ying
    Bi, Xiaotao
    ENERGIES, 2024, 17 (18)
  • [7] Hybrid coal-fired power plants with CO2 capture: A technical and economic evaluation based on computational simulations
    Huang, Y.
    Wang, M.
    Stephenson, P.
    Rezvani, S.
    McIlveen-Wright, D.
    Minchener, A.
    Hewitt, N.
    Dave, A.
    Fleche, A.
    FUEL, 2012, 101 : 244 - 253
  • [8] Industrial test and techno-economic analysis of CO2 capture in Huaneng Beijing coal-fired power station
    Huang Bin
    Xu Shisen
    Gao Shiwang
    Liu Lianbo
    Tao Jiye
    Niu Hongwei
    Cai Ming
    Cheng Jian
    APPLIED ENERGY, 2010, 87 (11) : 3347 - 3354
  • [9] TECHNO-ECONOMIC ASSESSMENT OF CARBON CAPTURE AND STORAGE FACILITIES COUPLED TO COAL-FIRED POWER PLANTS
    Zhang, Zhihua
    ENERGY & ENVIRONMENT, 2015, 26 (6-7) : 1069 - 1080
  • [10] Techno-economic assessment of CO2 capture integrated coal-fired power plant with energetic analysis
    Yun, Seokwon
    Lee, Sunghoon
    Jang, Mun-Gi
    Kim, Jin-Kuk
    ENERGY, 2021, 236