Genetic algorithm parameter optimisation using Taguchi method for a flexible manufacturing system scheduling problem

被引:52
作者
Candan, Gokce [1 ]
Yazgan, Harun Resit [1 ]
机构
[1] Sakarya Univ, Dept Ind Engn, Sakarya, Turkey
关键词
Taguchi orthogonal arrays method; flexible manufacturing system scheduling; genetic algorithm; NEURAL-NETWORKS; FMS; DESIGN;
D O I
10.1080/00207543.2014.939244
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The flexible manufacturing system (FMS) scheduling problem is one of the most difficult NP-hard combinatorial optimisation problems. The exact solution of an FMS scheduling problem cannot be found within a reasonable amount of time, even for small size problems. Therefore, a metaheuristic algorithm is required to solve such a problem. The objective of this study is to develop a genetic algorithm (GA) approach to minimise makespan of the scheduling problem. A Taguchi orthogonal array is proposed instead of a full factorial experimental design for determining the parameters of the GA. The effects of the GA parameters on the minimum makespan values are determined and an analysis of variance is performed to investigate significance factors on the results.
引用
收藏
页码:897 / 915
页数:19
相关论文
共 70 条
[1]  
AGGOUNE R, 2001, IEEE INT C SYST MAN, V4, P2546
[2]  
Altiparmak F., 2000, Transactions On Operational Research, V12, P57
[3]  
[Anonymous], 2024, P INT SCI CONFERENCE
[4]  
[Anonymous], 2005, Taguchi's Quality Engineering Handbook
[5]   An artificial immune algorithm for the flexible job-shop scheduling problem [J].
Bagheri, A. ;
Zandieh, M. ;
Mahdavi, Iraj ;
Yazdani, M. .
FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2010, 26 (04) :533-541
[6]   Discrepancy search for the flexible job shop scheduling problem [J].
Ben Hmida, Abir ;
Haouari, Mohamed ;
Huguet, Marie-Jose ;
Lopez, Pierre .
COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (12) :2192-2201
[7]   Metaheuristics in combinatorial optimization: Overview and conceptual comparison [J].
Blum, C ;
Roli, A .
ACM COMPUTING SURVEYS, 2003, 35 (03) :268-308
[8]  
Ceran G, 2006, THESIS SELCUK U
[9]  
Chan F. T. S., 2005, P IEEE INT S INT CON
[10]   A comprehensive survey and future trend of simulation study on FMS scheduling [J].
Chan, FTS ;
Chan, HK .
JOURNAL OF INTELLIGENT MANUFACTURING, 2004, 15 (01) :87-102