Algorithmic development of life-cycle assessment: Application of urban water infrastructure systems in Iran

被引:2
作者
Balali, Vahid [1 ]
Yaseri, Kourosh [2 ]
Ham, Youngjib [3 ]
机构
[1] Calif State Univ Long Beach, Dept Civil Engn & Construct Engn Management, Long Beach, CA 90815 USA
[2] Univ Tehran, Sch Civil Engn, Tehran, Iran
[3] Florida Int Univ, OHL Sch Construct, Coll Engn & Comp, Miami, FL 33174 USA
关键词
cost-benefit analysis; life cycle assessment; reliability; urban water infrastructure; COST; RELIABILITY; MODEL; DESIGN;
D O I
10.1007/s12205-016-0994-3
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Urban infrastructure has an indisputable role in society's productivity. Since the residents' quality of life is dependent on the performance of infrastructure systems, devising procedures for monitoring such systems' current performance and predicting their future capabilities are necessary. Proper monitoring regime will take into account the remaining efficient performance time of the system and allocate appropriate maintenance and rehabilitation activities, thereby increasing the system productivity. Due to the vital role of water in people's lives and the immense size and complexity of urban water-distribution systems, the operation of urban water infrastructure is worthy of special attention in this regard. This paper presents an advanced algorithm for life-cycle assessment (LCA) of urban water infrastructure that is capable of determining the optimal time for system rehabilitation, taking into account both the economic and structural aspects of the system performance. The efficiency of the proposed approach is examined through the case study on a real water-distribution system in Iran. The system performance is simulated over its projected performance period via different breakage scenarios, and its efficiency is quantified by using a reliability-based indicator. The costs and benefits associated with the infrastructure performance are then evaluated, and its remaining useful operational life is estimated based on the projected reliability of the system and revenue impacts. The results of the case study imply that the developed method can be used to complement current practices as a proper tool for life cycle assessment of urban water infrastructure.
引用
收藏
页码:1979 / 1990
页数:12
相关论文
共 38 条
[1]   Optimum flexible pavement life-cycle analysis model [J].
Abaza, KA .
JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 2002, 128 (06) :542-549
[2]  
Balali V., 2014, TRANSPORT RES REC, P78
[3]  
Balali V., 2014, American Journal of Civil Engineering and Architecture, V2, P149, DOI [10.12691/ajcea-2-5-1, DOI 10.12691/AJCEA-2-5-1]
[4]   Integration of ELECTRE III and PROMETHEE II Decision-Making Methods with an Interval Approach: Application in Selection of Appropriate Structural Systems [J].
Balali, Vahid ;
Zahraie, Banafsheh ;
Roozbahani, Abbas .
JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2014, 28 (02) :297-314
[5]  
Day GeorgeS., 1986, Analysis for Strategic Market Decisions
[6]  
DellIsola A., 2003, LIFE CYCLE COSTING F
[7]  
Estes A. C., 1997, P 7 IFIP WG7 5 WORK, P133
[8]  
FABRYCKY WolterJ., 1991, Life-cycle cost and economic analysis
[9]  
Flanagan R., 1989, LIFE CYCLE COSTING C
[10]  
FRANGOPOL DM, 1999, CASE STUDIES OPTIMAL