Discussion of "Differential settlement remediation for new shield metro tunnel in soft soils using corrective grouting method: case study"

被引:2
作者
Shirlaw, J. N. [1 ]
机构
[1] Golder Associates HK Ltd, Wan Chai, 17-F,88 Gloucester Rd, Hong Kong, Peoples R China
关键词
3;
D O I
10.1139/cgj-2019-0045
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
引用
收藏
页码:2018 / 2018
页数:1
相关论文
共 3 条
[1]   Factors affecting long-term efficiency of compensation grouting in clays [J].
Au, SKA ;
Soga, K ;
Jafari, MR ;
Bolton, MD ;
Komiya, K .
JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2003, 129 (03) :254-262
[2]  
Hoe, 1999, P INT S GEOT ASP UND, P107
[3]   Differential settlement remediation for new shield metro tunnel in soft soils using corrective grouting method: case study [J].
Zhou, Shunhua ;
Xiao, Junhua ;
Di, Honggui ;
Zhu, Yaohong .
CANADIAN GEOTECHNICAL JOURNAL, 2018, 55 (12) :1877-1887