共 40 条
[1]
ALFELD P, 1989, INT S NUM M, V90, P1
[2]
Allahyarzadeh-Bidgoli A., 2020, P 33 INT C EFF COST
[5]
Angelo C., 2019, IS BRAZIL WAY MEET I
[6]
[Anonymous], 2018, BP Energy Outlook
[7]
Aspen Technology Inc, 2017, ASPEN HYSYS V10 1
[9]
Bidgoli A.A., 2018, Simulation and optimization of primary oil and gas processing plant of FPSO operating in pre-salt oil field, DOI [10.11606/T.3.2018.tde-13122018-150547, DOI 10.11606/T.3.2018.TDE-13122018-150547]
[10]
BP p.l.c, 2020, STAT REV WORLD EN