Optimizing spinning reserve with regard to FACTS device effects on transmission network
被引:0
作者:
Chabok, Babak Safari
[1
]
Ashouri, Ahmad
[2
]
机构:
[1] Islamic Azad Univ, Dept Power Syst Engn, Tehran South Branch, Tehran, Iran
[2] Islamic Azad Univ, Dept Elect Engn, Khodabandeh Branch, Khodabandeh, Iran
关键词:
Thyristor-Controlled Series Capacitor (TCSC);
Expected Energy Not Supplied (EENS);
Location and Amount of Spinning Reserve (SR);
Risk Based Unit Commitment (RBUC);
Cost/Benefit Analysis;
Interruptible Loads (IL);
UNIT COMMITMENT;
REQUIREMENTS;
D O I:
10.3233/IFS-141213
中图分类号:
TP18 [人工智能理论];
学科分类号:
081104 ;
0812 ;
0835 ;
1405 ;
摘要:
This paper introduces a new algorithm for the parameter setting of FACTS devices such as TCSC in transmission networks while optimizing amount and location of spinning reserve, simultaneously. Spinning reserve is provided by GENCOs and Interruptible loads. Risk Based Unit Commitment has been solved by cost/benefit analysis according to a day-ahead pool market condition with simultaneous clearing energy and reserve. The expected cost of energy not supplied is considered as a probabilistic index for balancing between benefit derived from spinning reserve against an estimate of the cost of its provision. Single credible contingencies of generating units are applied for evaluation of generation (HLI) and generation/transmission (HLII) systems reliability. Finally, simulation study and sensitivity analysis to evaluate the effectiveness of new algorithm are performed on a four-bus typical test system by changing in one of important reliability factors such as value of lost load on different load buses of transmission network.