Approximating Weighted Completion Time for Order Scheduling with Setup Times

被引:0
|
作者
Maecker, Alexander
Der Heide, Friedhelm Meyer Auf
Pukrop, Simon [1 ]
机构
[1] Paderborn Univ, Heinz Nixdorf Inst, Furstenallee 11, D-33102 Paderborn, Germany
来源
SOFSEM 2020: THEORY AND PRACTICE OF COMPUTER SCIENCE | 2020年 / 12011卷
关键词
Order scheduling; Multioperation jobs; Total completion time; Approximation; Setup times; MULTI-OPERATION JOBS; COMPLEXITY;
D O I
10.1007/978-3-030-38919-2_8
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Consider a scheduling problem in which jobs need to be processed on a single machine. Each job has a weight and is composed of several operations belonging to different families. The machine needs to perform a setup between the processing of operations of different families. A job is completed when its latest operation completes and the goal is to minimize the total weighted completion time of all jobs. We study this problem from the perspective of approximability and provide constant factor approximations as well as an inapproximability result. Prior to this work, only the NP-hardness of the unweighted case and the polynomial solvability of a certain special case were known.
引用
收藏
页码:88 / 100
页数:13
相关论文
共 50 条
  • [41] A differential evolution algorithm for the customer order scheduling problem with sequence-dependent setup times
    Prata, Bruno de Athayde
    Rodrigues, Carlos Diego
    Manuel Framinan, Jose
    EXPERT SYSTEMS WITH APPLICATIONS, 2022, 189
  • [42] A polynomial time heuristic for the two-machine flowshop scheduling problem with setup times and random processing times
    Aydilek, Harun
    Allahverdi, Ali
    APPLIED MATHEMATICAL MODELLING, 2013, 37 (12-13) : 7164 - 7173
  • [43] Single Machine Scheduling Problem with Interval Processing Times and Total Completion Time Objective
    Sotskov, Yuri N.
    Egorova, Natalja G.
    ALGORITHMS, 2018, 11 (05)
  • [44] Flowshop scheduling problem to minimize total completion time with random and bounded processing times
    Sotskov, YN
    Allahverdi, A
    Lai, TC
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2004, 55 (03) : 277 - 286
  • [45] Minimizing the total completion time in a two-machine flowshop with sequence-independent setup times
    Ladhari, T.
    Msakni, M. K.
    Allahverdi, A.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2012, 63 (04) : 445 - 459
  • [46] Parallel machine scheduling with precedence constraints and setup times
    Gacias, Bernat
    Artigues, Christian
    Lopez, Pierre
    COMPUTERS & OPERATIONS RESEARCH, 2010, 37 (12) : 2141 - 2151
  • [47] Scheduling jobs with uncertain setup times and sequence dependency
    Kim, SC
    Bobrowski, PM
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1997, 25 (04): : 437 - 447
  • [48] Hybrid Flow Shop with Setup Times Scheduling Problem
    Jemmali, Mahdi
    Hidri, Lotfi
    COMPUTER SYSTEMS SCIENCE AND ENGINEERING, 2023, 44 (01): : 563 - 577
  • [49] Non-preemptive Scheduling with Setup Times: A PTAS
    Jansen, Klaus
    Land, Felix
    EURO-PAR 2016: PARALLEL PROCESSING, 2016, 9833 : 159 - 170
  • [50] Single machine scheduling with exponential time-dependent learning effect and past-sequence-dependent setup times
    Wang, Ji-Bo
    Wang, Dan
    Wang, Li-Yan
    Lin, Lin
    Yin, Na
    Wang, Wei-Wei
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2009, 57 (01) : 9 - 16