Evaluation of the Factors and Strategies for Water Infrastructure Project Delivery in South Africa

被引:11
作者
Aiyetan, Ayodeji Olatunji [1 ]
Das, Dillip Kumar [2 ]
机构
[1] Durban Univ Technol, Dept Construct Management & Quant Surveying, ZA-4000 Durban, South Africa
[2] Univ KwaZulu Natal, Discipline Civil Engn, ZA-4041 Durban, South Africa
关键词
construction management; project delivery; project management; organization and management; water infrastructure; CHALLENGES; MODELS;
D O I
10.3390/infrastructures6050065
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Infrastructure project delivery, specifically the delivery of water infrastructure projects, is a serious challenge in South Africa. Therefore, using the study context of water utility agencies in South Africa, the objective of this study was to examine the challenges that emanate from poor delivery and factors that cause poor delivery of water infrastructure projects in South Africa. Furthermore, it evaluated the various strategies that could enable improvement in water infrastructure project delivery. A survey research method constituting data obtained on the perceptions of relevant stakeholders and ordinal regression modeling were used for conducting the study. Findings suggest that delay in project completion, cost overruns, poor quality of work, poor fund utilization, and poor service delivery are the major challenges of the poor delivery of projects. The major factors that cause such challenges are linked to four aspects of the infrastructure projects such as project management, organization and management, construction and construction management, and sociopolitical. Six-pronged strategic measures, which include capacity building, the appointment of competent and skilled professionals, structuring review and monitoring processes, enhancing collaboration and communication among stakeholders, enabling accountability and transparency, and adopting participative leadership, can assist efficient water infrastructure project delivery in South Africa.
引用
收藏
页数:19
相关论文
共 44 条
  • [1] Aiyetan O.A., 2015, Journal of Construction Project Management & Innovation, V5, P1266
  • [2] Regression models for ordinal responses: A review of methods and applications
    Ananth, CV
    Kleinbaum, DG
    [J]. INTERNATIONAL JOURNAL OF EPIDEMIOLOGY, 1997, 26 (06) : 1323 - 1333
  • [3] [Anonymous], 2016, BUDG REV
  • [4] [Anonymous], 2005, MUNICIPAL FINANCE IN
  • [5] [Anonymous], 2020, SA PEOPLE NEWS
  • [6] [Anonymous], 2015, NAT TREAS SIPDM
  • [7] [Anonymous], 2008, GUID PROM GOOD GOV P
  • [8] [Anonymous], 2012, UMG WAT PROJ MAN PLA
  • [9] [Anonymous], 2008, DELIVERING GOODS INF
  • [10] Babbie E. R., 2010, The practice of social research, V5th