Preference-Oriented Fixed-Priority Scheduling for Real-Time Systems

被引:0
作者
Begam, Rehana [1 ]
Zhu, Dakai [1 ]
Aydin, Hakan [2 ]
机构
[1] Univ Texas San Antonio, San Antonio, TX 78249 USA
[2] George Mason Univ, Fairfax, VA 22030 USA
来源
2014 IEEE 12TH INTERNATIONAL CONFERENCE ON DEPENDABLE, AUTONOMIC AND SECURE COMPUTING (DASC)/2014 IEEE 12TH INTERNATIONAL CONFERENCE ON EMBEDDED COMPUTING (EMBEDDEDCOM)/2014 IEEE 12TH INTERNATIONAL CONF ON PERVASIVE INTELLIGENCE AND COMPUTING (PICOM) | 2014年
关键词
Real-Time Systems; Fixed-Priority Scheduling; Preference-Oriented Execution;
D O I
10.1109/DASC.2014.37
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Most real-time scheduling algorithms prioritize tasks solely based on their timing parameters and cannot effectively handle them when they have different execution preferences. In this paper, for a set of periodic tasks, where some tasks are preferably executed as soon as possible (ASAP) and others as late as possible (ALAP), we investigate preference-oriented fixedpriority scheduling algorithms. Specifically, following the idea in dual-priority scheduling, we derive promotion times for ALAP tasks (only). Then, we devise a dual-queue based fixed-priority scheduling algorithm that retains ALAP tasks in the waiting queue until their promotion times to delay their executions while putting ASAP tasks into the ready queue immediately once they arrive for early execution. We also investigate online techniques to further expedite (delay) the executions of ASAP (ALAP) tasks, respectively. Our evaluation results show that the dual-queue technique with ALAP tasks' promotion times can effectively address the execution preferences of both ASAP and ALAP tasks, which can be further improved at runtime with wrapper-task based slack management. Our technique is shown to yield clear advantages over a simple technique that periodically inserts idle intervals to the schedule before ALAP tasks are executed.
引用
收藏
页码:159 / +
页数:2
相关论文
共 13 条
[1]   APPLYING NEW SCHEDULING THEORY TO STATIC PRIORITY PREEMPTIVE SCHEDULING [J].
AUDSLEY, N ;
BURNS, A ;
RICHARDSON, M ;
TINDELL, K ;
WELLINGS, AJ .
SOFTWARE ENGINEERING JOURNAL, 1993, 8 (05) :284-292
[2]  
Bini E., 2004, P EUR C REAL TIM SYS
[3]   SOME RESULTS OF THE EARLIEST DEADLINE SCHEDULING ALGORITHM [J].
CHETTO, H ;
CHETTO, M .
IEEE TRANSACTIONS ON SOFTWARE ENGINEERING, 1989, 15 (10) :1261-1269
[4]  
Davis R, 1995, IEEE REAL TIME, P100, DOI 10.1109/REAL.1995.495200
[5]  
Ernst R, 1997, 1997 IEEE/ACM INTERNATIONAL CONFERENCE ON COMPUTER-AIDED DESIGN - DIGEST OF TECHNICAL PAPERS, P598, DOI 10.1109/ICCAD.1997.643600
[6]  
Guo Y., 2013, P IEEE INT C EMB REA
[7]  
Guo Y., 2013, P 1 WORKSH HIGH REL
[8]  
Guo Y., 2013, CSTR2013007 U TEX SA
[9]  
Haque M. A., 2013, PROC INT GREEN COMPU, P1
[10]   FINDING RESPONSE-TIMES IN A REAL-TIME SYSTEM [J].
JOSEPH, M ;
PANDYA, P .
COMPUTER JOURNAL, 1986, 29 (05) :390-395