Single-machine scheduling with a variable maintenance activity
被引:51
|
作者:
Luo, Wenchang
论文数: 0引用数: 0
h-index: 0
机构:
Ningbo Univ, Fac Sci, Ningbo 315211, Zhejiang, Peoples R ChinaNingbo Univ, Fac Sci, Ningbo 315211, Zhejiang, Peoples R China
Luo, Wenchang
[1
]
Cheng, T. C. E.
论文数: 0引用数: 0
h-index: 0
机构:
Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R ChinaNingbo Univ, Fac Sci, Ningbo 315211, Zhejiang, Peoples R China
Cheng, T. C. E.
[2
]
Ji, Min
论文数: 0引用数: 0
h-index: 0
机构:
Zhejiang Gongshang Univ, Sch Comp Sci & Informat Engn, Contemporary Business & Trade Res Ctr, Hangzhou 310018, Zhejiang, Peoples R ChinaNingbo Univ, Fac Sci, Ningbo 315211, Zhejiang, Peoples R China
Ji, Min
[3
]
机构:
[1] Ningbo Univ, Fac Sci, Ningbo 315211, Zhejiang, Peoples R China
[2] Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
[3] Zhejiang Gongshang Univ, Sch Comp Sci & Informat Engn, Contemporary Business & Trade Res Ctr, Hangzhou 310018, Zhejiang, Peoples R China
Scheduling;
Maintenance;
Single machine;
Polynomial-time algorithm;
NON-AVAILABILITY INTERVAL;
APPROXIMATION ALGORITHMS;
COMPLETION TIMES;
LATE JOBS;
CONSTRAINTS;
MINIMIZE;
MAKESPAN;
NUMBER;
D O I:
10.1016/j.cie.2014.11.002
中图分类号:
TP39 [计算机的应用];
学科分类号:
081203 ;
0835 ;
摘要:
We consider the problem maintenance activity must starting time. We provide sum of completion times, of scheduling a maintenance activity and jobs on a single machine, where the start before a given deadline and the maintenance duration increases with its polynomial-time algorithms to solve the problems to minimize the makespan, maximum lateness, and number of tardy jobs. (C) 2014 Elsevier Ltd. All rights reserved.
机构:
Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R ChinaHong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
Cheng, T. C. E.
Tseng, Shih-Chang
论文数: 0引用数: 0
h-index: 0
机构:
Natl Cent Univ, Dept Business Adm, Tao Yuan, TaiwanHong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
Tseng, Shih-Chang
Lai, Peng-Jen
论文数: 0引用数: 0
h-index: 0
机构:
Natl Kaohsiung Normal Univ, Dept Math, Kaohsiung, TaiwanHong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
Lai, Peng-Jen
Lee, Wen-Chiung
论文数: 0引用数: 0
h-index: 0
机构:
Feng Chia Univ, Dept Stat, Taichung 40724, TaiwanHong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
机构:
Zhengzhou Univ, Sch Math & Stat, Zhengzhou 450001, Peoples R China
Qufu Normal Univ, Sch Math Sci, Qufu 273165, Shandong, Peoples R ChinaZhengzhou Univ, Sch Math & Stat, Zhengzhou 450001, Peoples R China
Zou, Juan
Yuan, Jinjiang
论文数: 0引用数: 0
h-index: 0
机构:
Zhengzhou Univ, Sch Math & Stat, Zhengzhou 450001, Peoples R ChinaZhengzhou Univ, Sch Math & Stat, Zhengzhou 450001, Peoples R China
机构:
E China Univ Sci & Technol, Sch Sci, Dept Math, Shanghai 200237, Peoples R ChinaE China Univ Sci & Technol, Sch Sci, Dept Math, Shanghai 200237, Peoples R China
Li, Ganggang
Lu, Xiwen
论文数: 0引用数: 0
h-index: 0
机构:
E China Univ Sci & Technol, Sch Sci, Dept Math, Shanghai 200237, Peoples R ChinaE China Univ Sci & Technol, Sch Sci, Dept Math, Shanghai 200237, Peoples R China
机构:
East China Univ Technol, Sch Sci, Nanchang 330013, Jiangxi, Peoples R ChinaEast China Univ Technol, Sch Sci, Nanchang 330013, Jiangxi, Peoples R China
Wang, Qi
Liu, Aihua
论文数: 0引用数: 0
h-index: 0
机构:
East China Univ Technol, Sch Sci, Nanchang 330013, Jiangxi, Peoples R ChinaEast China Univ Technol, Sch Sci, Nanchang 330013, Jiangxi, Peoples R China
Liu, Aihua
Xiao, Junfang
论文数: 0引用数: 0
h-index: 0
机构:
East China Univ Technol, Sch Sci, Nanchang 330013, Jiangxi, Peoples R ChinaEast China Univ Technol, Sch Sci, Nanchang 330013, Jiangxi, Peoples R China