The Enhanced-Earned Value Management (E-EVM) Model: A Proposal for the Aerospace Industry

被引:5
|
作者
Lopez Pascual, Joaquin [1 ]
Melendez Rodriguez, Juan Carlos [2 ]
Cruz Rambaud, Salvador [3 ]
机构
[1] Univ Rey Juan Carlos, Dept Econ Empresa, Madrid 28032, Spain
[2] Univ Complutense Madrid, Dept Org Empresas & Mkt, Campus Somosaguas, Madrid 28223, Spain
[3] Univ Almeria, Dept Econ & Empresa, La Canada de San Urbano S-N, Almeria 04120, Spain
来源
SYMMETRY-BASEL | 2021年 / 13卷 / 02期
关键词
aerospace industry; enhanced earned value management; project management; data compression; pattern recognition; PROJECT-MANAGEMENT; SCHEDULE CONTROL; INTEGRATED COST; RISK ANALYSIS; PERFORMANCE; QUALITY; COMPLETION; TIME;
D O I
10.3390/sym13020232
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The framework of this paper is the aerospace industry, which is one of the world's leading sectors, thus playing a noteworthy role in current society. This makes it especially important to try to optimize the management of the aerospace sector. Therefore, the main objective of this paper is to propose the so-called Enhanced-Earned Value Management (hereinafter, E-EVM) model, able to explore the simultaneous evaluation of many projects, from which the management of the project can take advantage. Additionally, this model considers the possibility of forecasting pending tasks, measurable in time units or cost units, until the end of the project. The main contribution of E-EVM methodology is its capacity to detect both delayed and advanced projects by converting times (hours) into monetary units (EUR). Empirically, this enhanced model has been applied to a real case study in the aerospace industry composed of thousands of subprojects and the results provide the project manager with valuable information to make decisions in a short term. Through computer graphic representation techniques, the visualization of project deployment can be improved. Finally, the E-EVM model can be used even in big projects where a very large volume of information must be simultaneously treated and also, it will be suitable to apply pattern recognition concerning the project performance.
引用
收藏
页码:1 / 18
页数:18
相关论文
共 50 条
  • [41] A model to control environmental performance of project execution process based on greenhouse gas emissions using earned value management
    Abdi, Abdollah
    Taghipour, Sharareh
    Khamooshi, Homayoun
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2018, 36 (03) : 397 - 413
  • [42] PROJECT MANAGEMENT AS A VALUE CREATOR AGENT OF INNOVATION AND BUSINESS ECOSYSTEMS: AN INTEGRATIVE MODEL PROPOSAL
    do Amaral, Caio Senna
    Alves, Josivan Leite
    Berssaneti, Fernando Tobal
    de Carvalho, Marly Monteiro
    REVISTA DE GESTAO E PROJETOS, 2023, 15 (01): : 142 - 172
  • [43] SUPPLY CHAIN QUALITY MANAGEMENT (SCQM) LITERATURE REVIEW AND MODEL PROPOSAL IN THE ERA OF INDUSTRY 4.0
    Zimon, Dominik
    Urbaniak, Maciej
    Madzik, Peter
    Prokopiuk, Iryna
    INTERNATIONAL JOURNAL FOR QUALITY RESEARCH, 2022, 16 (04) : 1283 - 1296
  • [44] ISO 50001 standard-based energy management maturity model - proposal and validation in industry
    Jovanovic, Bojana
    Filipovic, Jovan
    JOURNAL OF CLEANER PRODUCTION, 2016, 112 : 2744 - 2755
  • [45] Proposal of Sustainability Indicators for the Waste Management from the Paper Industry within the Circular Economy Model
    Molina-Sanchez, Emiliano
    Carlos Leyva-Diaz, Juan
    Joaquin Cortes-Garcia, Francisco
    Molina-Moreno, Valentin
    WATER, 2018, 10 (08)
  • [46] Yield Management with SD Model Based on Customer Lifetime Value in Semiconductor Industry
    Han, Guanghua
    Dong, Ming
    FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE, PTS 1-4, 2011, 44-47 : 869 - +
  • [47] Evaluation and development of management model for sustainable value chain in Indian construction industry
    Srikar, T.
    Ratnamala, Bommareddy Sesha Sai
    Lakshmi, V. Sree
    MATERIALS TODAY-PROCEEDINGS, 2022, 60 : 1623 - 1628
  • [48] Surgical Management of Obesity in Brazil: Proposal for a Value-Based Healthcare Model and Preliminary Results
    Cohen, Ricardo Vitor
    Nishikawa, Alvaro Mitsunori
    Ribeiro, Rodrigo Antonini
    Oliveira, Fernanda Maria
    Andrade, Priscila Caldeira
    Junqueira, Silvio Mauro
    Toldo, Bruno
    VALUE IN HEALTH REGIONAL ISSUES, 2021, 26 : 10 - 14
  • [49] Integrating the multi-objective elephant herding optimization based time–cost trade-off model with earned value management
    Gupta R.
    Trivedi M.K.
    Asian Journal of Civil Engineering, 2023, 24 (4) : 1027 - 1039
  • [50] Proposal of a Mathematical Model of Prediction of Sinistrality Values for Valuation of Organizational Management Indicators, Applied to the Construction Industry
    Oliveira, Paulo
    Baptista, Joao
    Pais, Rui
    ADVANCES IN SAFETY MANAGEMENT AND HUMAN FACTORS, AHFE 2017, 2018, 604 : 375 - 383