The Enhanced-Earned Value Management (E-EVM) Model: A Proposal for the Aerospace Industry

被引:5
|
作者
Lopez Pascual, Joaquin [1 ]
Melendez Rodriguez, Juan Carlos [2 ]
Cruz Rambaud, Salvador [3 ]
机构
[1] Univ Rey Juan Carlos, Dept Econ Empresa, Madrid 28032, Spain
[2] Univ Complutense Madrid, Dept Org Empresas & Mkt, Campus Somosaguas, Madrid 28223, Spain
[3] Univ Almeria, Dept Econ & Empresa, La Canada de San Urbano S-N, Almeria 04120, Spain
来源
SYMMETRY-BASEL | 2021年 / 13卷 / 02期
关键词
aerospace industry; enhanced earned value management; project management; data compression; pattern recognition; PROJECT-MANAGEMENT; SCHEDULE CONTROL; INTEGRATED COST; RISK ANALYSIS; PERFORMANCE; QUALITY; COMPLETION; TIME;
D O I
10.3390/sym13020232
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The framework of this paper is the aerospace industry, which is one of the world's leading sectors, thus playing a noteworthy role in current society. This makes it especially important to try to optimize the management of the aerospace sector. Therefore, the main objective of this paper is to propose the so-called Enhanced-Earned Value Management (hereinafter, E-EVM) model, able to explore the simultaneous evaluation of many projects, from which the management of the project can take advantage. Additionally, this model considers the possibility of forecasting pending tasks, measurable in time units or cost units, until the end of the project. The main contribution of E-EVM methodology is its capacity to detect both delayed and advanced projects by converting times (hours) into monetary units (EUR). Empirically, this enhanced model has been applied to a real case study in the aerospace industry composed of thousands of subprojects and the results provide the project manager with valuable information to make decisions in a short term. Through computer graphic representation techniques, the visualization of project deployment can be improved. Finally, the E-EVM model can be used even in big projects where a very large volume of information must be simultaneously treated and also, it will be suitable to apply pattern recognition concerning the project performance.
引用
收藏
页码:1 / 18
页数:18
相关论文
共 50 条
  • [31] Hybrid Artificial Neural Network and Statistical Model for Forecasting Project Total Duration in Earned Value Management
    Li, You
    Liu, Lu
    NINTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I-III, 2010, : 2603 - 2609
  • [32] Hybrid artificial neural network and statistical model for forecasting project total duration in earned value management
    Li, Y. (lijinbi-sony@163.com), 1600, Inderscience Publishers (10): : 3 - 4
  • [33] Management model innovation for ship-building industry in e-Era based on value chain optimization
    Wang, Yujing
    Chen, Wei
    PROCEEDINGS OF THE 2008 INTERNATIONAL CONFERENCE ON E-RISK MANAGEMENT (ICERM 2008), 2008, : 597 - 602
  • [34] Industry 4.0 for passenger railway companies: A maturity model proposal for technology management
    Franz, Michael Luciano Chaves
    Ayala, Nestor Fabia
    Larranaga, Ana Margarita
    JOURNAL OF RAIL TRANSPORT PLANNING & MANAGEMENT, 2024, 32
  • [35] Model Of Integrated Management Of Public Procurement Oriented To Public Value: A Proposal Research
    de Freitas Soares Ferreira, Isabel Maria
    Martins Amaral, Luis Alfredo
    CREATING GLOBAL COMPETITIVE ECONOMIES: A 360-DEGREE APPROACH, VOLS 1-4, 2011, : 2093 - 2098
  • [36] Proposal of a Knowledge Management Model for Launch Operations at the Brazilian Aerospace Technology Center: The case of the Interface Launch Group
    Limonge, Willian
    Durante, Eracles
    Soto Urbina, Ligia Maria
    PROCEEDINGS OF PICMET 09 - TECHNOLOGY MANAGEMENT IN THE AGE OF FUNDAMENTAL CHANGE, VOLS 1-5, 2009, : 1030 - +
  • [37] Proposal and Simulation of a Business Process Model of Strategic Management in E-commerce
    Svatosova, Veronika
    EKONOMICKY CASOPIS, 2021, 69 (07): : 726 - 749
  • [38] Proposal of a Model for Improving the Management of the Wind Energy Industry in the Context of Sustainable Development Challenges
    Pabian, Aleksander
    Pabian, Barbara
    Bilinska, Katarzyna
    ENERGIES, 2025, 18 (04)
  • [39] A time-cost trade-off model by incorporating fuzzy earned value management: A statistical based approach
    Salari, Mostafa
    Bagherpour, Morteza
    Reihani, Mohammad Hossein
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2015, 28 (04) : 1909 - 1919
  • [40] Cooperative systems: an information systems model for industry value chain management
    Fleming, GF
    INTERNATIONAL SUGAR JOURNAL, 2006, 108 (1290): : 299 - +