The Enhanced-Earned Value Management (E-EVM) Model: A Proposal for the Aerospace Industry

被引:5
作者
Lopez Pascual, Joaquin [1 ]
Melendez Rodriguez, Juan Carlos [2 ]
Cruz Rambaud, Salvador [3 ]
机构
[1] Univ Rey Juan Carlos, Dept Econ Empresa, Madrid 28032, Spain
[2] Univ Complutense Madrid, Dept Org Empresas & Mkt, Campus Somosaguas, Madrid 28223, Spain
[3] Univ Almeria, Dept Econ & Empresa, La Canada de San Urbano S-N, Almeria 04120, Spain
来源
SYMMETRY-BASEL | 2021年 / 13卷 / 02期
关键词
aerospace industry; enhanced earned value management; project management; data compression; pattern recognition; PROJECT-MANAGEMENT; SCHEDULE CONTROL; INTEGRATED COST; RISK ANALYSIS; PERFORMANCE; QUALITY; COMPLETION; TIME;
D O I
10.3390/sym13020232
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The framework of this paper is the aerospace industry, which is one of the world's leading sectors, thus playing a noteworthy role in current society. This makes it especially important to try to optimize the management of the aerospace sector. Therefore, the main objective of this paper is to propose the so-called Enhanced-Earned Value Management (hereinafter, E-EVM) model, able to explore the simultaneous evaluation of many projects, from which the management of the project can take advantage. Additionally, this model considers the possibility of forecasting pending tasks, measurable in time units or cost units, until the end of the project. The main contribution of E-EVM methodology is its capacity to detect both delayed and advanced projects by converting times (hours) into monetary units (EUR). Empirically, this enhanced model has been applied to a real case study in the aerospace industry composed of thousands of subprojects and the results provide the project manager with valuable information to make decisions in a short term. Through computer graphic representation techniques, the visualization of project deployment can be improved. Finally, the E-EVM model can be used even in big projects where a very large volume of information must be simultaneously treated and also, it will be suitable to apply pattern recognition concerning the project performance.
引用
收藏
页码:1 / 18
页数:18
相关论文
共 56 条
[1]  
Abba W., P PROJ MAN I ANN SEM
[2]   Beyond Earned Value Management: A Graphical Framework for Integrated Cost, Schedule and Risk Monitoring [J].
Acebes, Fernando ;
Pajares, Javier ;
Manuel Galan, Jose ;
Lopez-Paredes, Adolfo .
SELECTED PAPERS FROM THE 26TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), WORLD CONGRESS, 2013, 74 :181-189
[3]   A new approach for project control under uncertainty. Going back to the basics [J].
Acebes, Fernando ;
Pajares, Javier ;
Manuel Galan, Jose ;
Lopez-Paredes, Adolfo .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (03) :423-434
[4]  
Anbari F.T., 2003, Project Management Journal, V34, P12, DOI DOI 10.1177/875697280303400403
[5]  
Antvik S., 2002, P PROJ MAN I ANN SEM
[6]   Control of construction projects using the Earned Value Method - case study [J].
Araszkiewicz, Krystyna ;
Bochenek, Magdalena .
OPEN ENGINEERING, 2019, 9 (01) :186-195
[7]  
Association for Project Management, 2013, EARN VAL MAN HDB
[8]   STARDUST: implementing a new manage-to-budget paradigm [J].
Atkins, KL ;
Martin, BD ;
Vellinga, JM ;
Price, RA .
ACTA ASTRONAUTICA, 2003, 52 (2-6) :87-97
[9]  
Atkinson R., 1999, International Journal of Project Management, V17, P337, DOI [10.1016/S0263-7863(98)00069-6, DOI 10.1016/S0263-7863(98)00069-6]
[10]   Project management with time, cost, and quality considerations [J].
Babu, AJG ;
Suresh, N .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 88 (02) :320-327