The Enhanced-Earned Value Management (E-EVM) Model: A Proposal for the Aerospace Industry

被引:5
|
作者
Lopez Pascual, Joaquin [1 ]
Melendez Rodriguez, Juan Carlos [2 ]
Cruz Rambaud, Salvador [3 ]
机构
[1] Univ Rey Juan Carlos, Dept Econ Empresa, Madrid 28032, Spain
[2] Univ Complutense Madrid, Dept Org Empresas & Mkt, Campus Somosaguas, Madrid 28223, Spain
[3] Univ Almeria, Dept Econ & Empresa, La Canada de San Urbano S-N, Almeria 04120, Spain
来源
SYMMETRY-BASEL | 2021年 / 13卷 / 02期
关键词
aerospace industry; enhanced earned value management; project management; data compression; pattern recognition; PROJECT-MANAGEMENT; SCHEDULE CONTROL; INTEGRATED COST; RISK ANALYSIS; PERFORMANCE; QUALITY; COMPLETION; TIME;
D O I
10.3390/sym13020232
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The framework of this paper is the aerospace industry, which is one of the world's leading sectors, thus playing a noteworthy role in current society. This makes it especially important to try to optimize the management of the aerospace sector. Therefore, the main objective of this paper is to propose the so-called Enhanced-Earned Value Management (hereinafter, E-EVM) model, able to explore the simultaneous evaluation of many projects, from which the management of the project can take advantage. Additionally, this model considers the possibility of forecasting pending tasks, measurable in time units or cost units, until the end of the project. The main contribution of E-EVM methodology is its capacity to detect both delayed and advanced projects by converting times (hours) into monetary units (EUR). Empirically, this enhanced model has been applied to a real case study in the aerospace industry composed of thousands of subprojects and the results provide the project manager with valuable information to make decisions in a short term. Through computer graphic representation techniques, the visualization of project deployment can be improved. Finally, the E-EVM model can be used even in big projects where a very large volume of information must be simultaneously treated and also, it will be suitable to apply pattern recognition concerning the project performance.
引用
收藏
页码:1 / 18
页数:18
相关论文
共 50 条
  • [1] Earned Value Management: A Global and Cross-Industry Perspective on Current EVM Practice
    Rowe, Sandra F.
    PROJECT MANAGEMENT JOURNAL, 2010, 41 (05) : 90 - 90
  • [2] Cost/Schedule Monitoring and Forecasting for Project Based on Earned Value Management (EVM)
    Huang, Jianwen
    Pan, Huimin
    Li, Yan
    Zhu, Yiting
    Liao, Zaiyi
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1437 - +
  • [3] An Overview of Earned Value Management in Airspace Industry
    Melendez Rodriguez, Juan Carlos
    Lopez Pascual, Joaquin
    Canmero Molina, Pedro
    Garcla Marquez, Fausto Pedro
    PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2017, 502 : 1465 - 1477
  • [4] Integrated cost, quality, risk and schedule control through earned value management (EVM)
    Khesal, Tahereh
    Saghaei, Abbas
    Khalilzadeh, Mohammad
    Galankashi, Masoud Rahiminezhad
    Soltani, Roya
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2019, 17 (01) : 183 - 203
  • [5] Using cost-risk to connect cost estimating and earned value management (EVM)
    Graham, David R.
    2007 IEEE AEROSPACE CONFERENCE, VOLS 1-9, 2007, : 4663 - 4671
  • [6] Use of Earned Value Management in the UAE Construction Industry
    Morad, Mohamed
    El-Sayegh, Sameh M.
    2016 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATIONS (ICIMSA), 2016,
  • [7] Project Management Model: Integrating Earned Schedule, Quality, and Risk in Earned Value Management
    Miguel, Angelimarie
    Madria, Wira
    Polancos, Ronaldo
    2019 IEEE 6TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), 2019, : 622 - 628
  • [8] Leveraging Linked Data for Knowledge Management: A Proposal for the Aerospace Industry
    Procko, Tyler Thomas
    Ochoa, Omar
    JOURNAL OF AEROSPACE INFORMATION SYSTEMS, 2024, 21 (11): : 927 - 938
  • [9] A Proposal to Improve the Earned Value Management Technique Using Quality Data in Software Projects
    Lima Francisco, Christopher de Souza
    de Souza, Adler Diniz
    16TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY-NEW GENERATIONS (ITNG 2019), 2019, 800 : 593 - 600
  • [10] Earned Value Management Agent-Based Simulation Model
    Castanon-Puga, Manuel
    Rosales-Cisneros, Ricardo Fernando
    Acosta-Prado, Julio Cesar
    Tirado-Ramos, Alfredo
    Khatchikian, Camilo
    Aburto-Camacllanqui, Elias
    SYSTEMS, 2023, 11 (02):