Analysis of overload conditions in distance relay under severe system contingencies

被引:18
作者
Abu Bakar, Ab Halim [1 ]
Yatim, Fazilah Mat [2 ]
Yusof, Sallehuddin
Othman, Mohd Ridzal [2 ]
机构
[1] Univ Malaya, Dept Elect Engn, Kuala Lumpur, Malaysia
[2] Transmiss Div, Tenaga Nasional Berhad, Malaysia
关键词
Contingency; Load encroachment; Power swing;
D O I
10.1016/j.ijepes.2009.11.023
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Distance relay protection is widely used worldwide for protection scheme on high voltage transmission lines. This protection tends to be prone to load encroachment condition causing possible undesired tripping condition. Investigations of two system disturbances that occurred in TNB's (Tenaga Nasional Berhad) Grid in the year 2003 and 2005 have clearly revealed the occurrence of load encroachment condition following line overloads after large number of line tripping. Examination of the impedance locus trajectory during the overload events have enabled a distinction be made between power swing and load encroachment phenomena. This paper presents the analysis and findings of the investigation of the load encroachment phenomena of the two events, including other related transmission line contingencies. (C) 2009 Elsevier Ltd. All rights reserved.
引用
收藏
页码:345 / 350
页数:6
相关论文
共 6 条
[1]  
ASPOSTOLOV AP, 2004, POW ENG SOC GEN M 20, V1, P100
[2]  
DONG K, INT J ELECT POWER EN, V28
[3]  
DUSKO PN, INT J ELECT POWER EN, V28
[4]  
MAT YF, 2005, THESIS U MALAYA
[5]  
MING J, 2003, INTERNET ARTICLE POW
[6]  
*POW APP LTD, ADV POW SOL SDN BHD