Heuristics and iterated greedy algorithms for the distributed mixed no-idle flowshop with sequence-dependent setup times

被引:32
作者
Rossi, Fernando Luis [1 ]
Nagano, Marcelo Seido [2 ]
机构
[1] Fed Inst Sao Paulo, Management Dept, Sao Paulo, SP, Brazil
[2] Univ Sao Paulo, Sao Carlos Sch Engn, Dept Ind Engn, Sao Paulo, SP, Brazil
关键词
Scheduling; Distributed flowshop; Setup times; No-idle; Makespan; DIFFERENTIAL EVOLUTION ALGORITHM; COMPETITIVE MEMETIC ALGORITHM; HIGH-PERFORMING HEURISTICS; 2-STAGE ASSEMBLY FLOWSHOP; HYBRID GENETIC ALGORITHM; PERMUTATION FLOWSHOP; MINIMIZING MAKESPAN; SCHEDULING PROBLEM; TOTAL TARDINESS; SEARCH ALGORITHM;
D O I
10.1016/j.cie.2021.107337
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The distributed permutation flowshop scheduling problem (DPFSP) has attracted a lot of attention in recent years, as current production systems frequently operate multiple factories at once. Due to the practical relevance of mixed no-idle flowshop, we address an extension of the DPFSP where there are identical factories, each one with a mixed no-idle flowshop environment. In a mixed no-idle flowshop regular machines exist side-by-side with stages that require a non-stop process. The addressed problem also takes into account sequence-dependent setup times on conventional machines. To the extent of our knowledge, this issue has not yet been examined in the literature despite it can be encountered in current manufacturing systems. For the purpose, we present a MILP formulation, a novel constructive heuristic and iterated greedy algorithms. A new construction scheme based on inter-factory and intra-factory improvement schemes is provided for the novel heuristic to further improve the solution quality given by the method. For the iterated greedy algorithm, we developed a new efficient reconstruction strategy to enhance the exploration capability of the algorithm. Furthermore, a large new benchmark was generated using a well recognized set of instances. The state-of-the-art methods and our proposed algorithms were tested in an extensive statistical and computational experiment. The analysis show that our proposals outperformed the methods from the literature.
引用
收藏
页数:16
相关论文
共 120 条
[1]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[2]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[3]   The significance of reducing setup times/setup costs [J].
Allahverdi, Ali ;
Soroush, H. M. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :978-984
[4]   The third comprehensive survey on scheduling problems with setup times/costs [J].
Allahverdi, Ali .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (02) :345-378
[5]  
Bargaoui H, 2016, IEEE C EVOL COMPUTAT, P2919, DOI 10.1109/CEC.2016.7744158
[6]   A survey of multi-factory scheduling [J].
Behnamian, J. ;
Ghomi, S. M. T. Fatemi .
JOURNAL OF INTELLIGENT MANUFACTURING, 2016, 27 (01) :231-249
[7]   Improving the migrating birds optimization metaheuristic for the permutation flow shop with sequence-dependent set-up times [J].
Benkalai, Imene ;
Rebaine, Djamal ;
Gagne, Caroline ;
Baptiste, Pierre .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (20) :6145-6157
[8]   Parallel flowshop scheduling using Tabu search [J].
Cao, D ;
Chen, MY .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (13) :3059-3073
[9]   Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach [J].
Chan, Felix T. S. ;
Chung, S. H. ;
Chan, L. Y. ;
Finke, G. ;
Tiwari, M. K. .
ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 2006, 22 (5-6) :493-504
[10]   An adaptive genetic algorithm with dominated genes for distributed scheduling problems [J].
Chan, FTS ;
Chung, SH ;
Chan, PLY .
EXPERT SYSTEMS WITH APPLICATIONS, 2005, 29 (02) :364-371