Fault-tree-based instantaneous risk computing core in nuclear power plant risk monitor

被引:17
作者
Wang, Jin [1 ]
Wang, Fang [1 ]
Chen, Shanqi [1 ]
Wang, Jiaqun [1 ]
Hu, Liqin [1 ]
Yin, Yuan [2 ]
Wu, Yican [1 ]
机构
[1] Chinese Acad Sci, Inst Nucl Energy Safety Technol, Key Lab Neutron & Radiat Safety, Hefei 230031, Anhui, Peoples R China
[2] Shenzhen Univ, Coll Math & Computat Sci, Shenzhen 518060, Guangdong, Peoples R China
关键词
Fault tree; Instantaneous risk analysis; Computing core; Nuclear power plant; Risk monitor; PROBABILISTIC SAFETY ASSESSMENT; CONCEPTUAL DESIGN; BLANKET; SYSTEM; RATIO; ITER;
D O I
10.1016/j.anucene.2016.02.024
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Risk monitor is an application of Probabilistic Safety Assessment (PSA) methodology, which has been widely used to determine the instantaneous risk based on the actual configuration of the nuclear power plant (NPP). The instantaneous risk model which has been converted from the baseline risk model of PSA is the fundament of instantaneous risk analysis in a risk monitor. However, the instantaneous risk model is usually very huge and complex, which is hard to be calculated and analyzed by hand. A fault-tree-based instantaneous risk computing core was developed by FDS Team. This code adopts the fast fault tree analysis method based on modified Zero-suppressed Binary Decision Diagram (ZBDD), which includes a set of algorithms such as fault tree importing, fault tree reduction, ZBDD variable ordering, ZBDD parallel manipulation' and cut-sets-based ZBDD reconstruction, etc. Benchmarks of actual NPP instantaneous risk models compared with similar codes showed that this code was correct and efficient. This computing core was applied in the Third Qinshan NPP risk monitor TQRIVI, and some cases based on the actual NPP instantaneous risk models are given. (C) 2016 Published by Elsevier Ltd.
引用
收藏
页码:35 / 41
页数:7
相关论文
共 50 条
  • [41] Risk assessment for radioactive contamination of the environment during operation of a nuclear power plant
    Kryshev, II
    Ryazantsev, EP
    ATOMIC ENERGY, 1998, 85 (02) : 583 - 588
  • [42] Risk Assessment of Test Cycle Change of Important Equipment in Nuclear Power Plant
    Yu, Xipeng
    Dai, Hongwei
    2024 6TH ASIA ENERGY AND ELECTRICAL ENGINEERING SYMPOSIUM, AEEES 2024, 2024, : 378 - 382
  • [43] Study on Supply Chain and Its Risk Control in Chinese Nuclear Power Plant
    Wang Ruibing
    Wang Daoping
    PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 576 - 581
  • [44] A fuzzy-based reliability approach to evaluate basic events of fault tree analysis for nuclear power plant probabilistic safety assessment
    Purba, Julwan Hendry
    ANNALS OF NUCLEAR ENERGY, 2014, 70 : 21 - 29
  • [45] Risk Analysis and Control of Land Transport of Hazardous Chemicals Based on Fault Tree
    Luo, Yuelei
    Cao, Yan
    Mu, Xiangwei
    LISS 2013, 2015, : 573 - 577
  • [46] Nuclear power plant fault diagnosis based on genetic-RBF neural network
    Shi Xiao-cheng
    Xie Chun-ling
    Wang Yuan-hui
    JOURNAL OF MARINE SCIENCE AND APPLICATION, 2006, 5 (03) : 57 - 62
  • [48] A Study of Fault Diagnosis of Nuclear Power Plant Clock System Based on Evidence Theory
    Zhai, Shouyang
    Bai, Bo
    PROCEEDINGS OF 2016 8TH IEEE INTERNATIONAL CONFERENCE ON COMMUNICATION SOFTWARE AND NETWORKS (ICCSN 2016), 2016, : 356 - 359
  • [49] Development and Validation of a Nuclear Power Plant Fault Diagnosis System Based on Deep Learning
    Liu, Bing
    Lei, Jichong
    Xie, Jinsen
    Zhou, Jianliang
    ENERGIES, 2022, 15 (22)
  • [50] Nuclear power plant fault diagnosis based on genetic-RBF neural network
    Xiao-cheng Shi
    Chun-ling Xie
    Yuan-hui Wang
    Journal of Marine Science and Application, 2006, 5 (3) : 57 - 62