Fault-tree-based instantaneous risk computing core in nuclear power plant risk monitor

被引:17
|
作者
Wang, Jin [1 ]
Wang, Fang [1 ]
Chen, Shanqi [1 ]
Wang, Jiaqun [1 ]
Hu, Liqin [1 ]
Yin, Yuan [2 ]
Wu, Yican [1 ]
机构
[1] Chinese Acad Sci, Inst Nucl Energy Safety Technol, Key Lab Neutron & Radiat Safety, Hefei 230031, Anhui, Peoples R China
[2] Shenzhen Univ, Coll Math & Computat Sci, Shenzhen 518060, Guangdong, Peoples R China
关键词
Fault tree; Instantaneous risk analysis; Computing core; Nuclear power plant; Risk monitor; PROBABILISTIC SAFETY ASSESSMENT; CONCEPTUAL DESIGN; BLANKET; SYSTEM; RATIO; ITER;
D O I
10.1016/j.anucene.2016.02.024
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Risk monitor is an application of Probabilistic Safety Assessment (PSA) methodology, which has been widely used to determine the instantaneous risk based on the actual configuration of the nuclear power plant (NPP). The instantaneous risk model which has been converted from the baseline risk model of PSA is the fundament of instantaneous risk analysis in a risk monitor. However, the instantaneous risk model is usually very huge and complex, which is hard to be calculated and analyzed by hand. A fault-tree-based instantaneous risk computing core was developed by FDS Team. This code adopts the fast fault tree analysis method based on modified Zero-suppressed Binary Decision Diagram (ZBDD), which includes a set of algorithms such as fault tree importing, fault tree reduction, ZBDD variable ordering, ZBDD parallel manipulation' and cut-sets-based ZBDD reconstruction, etc. Benchmarks of actual NPP instantaneous risk models compared with similar codes showed that this code was correct and efficient. This computing core was applied in the Third Qinshan NPP risk monitor TQRIVI, and some cases based on the actual NPP instantaneous risk models are given. (C) 2016 Published by Elsevier Ltd.
引用
收藏
页码:35 / 41
页数:7
相关论文
共 50 条
  • [21] Development of Risk Criteria for Permanent Changes in a Nuclear Power Plant
    Cepin, Marko
    ELEKTROTEHNISKI VESTNIK-ELECTROCHEMICAL REVIEW, 2006, 73 (2-3): : 149 - 154
  • [22] Preliminary Quantitative Evaluation of Potential Risk for HCCB TBS Tritium Extraction System Based on Fault Tree Analysis
    Xu, Jiawen
    Wang, Dagui
    Wang, Jin
    Wang, Jiaqun
    Hu, Liqin
    JOURNAL OF FUSION ENERGY, 2015, 34 (06) : 1369 - 1377
  • [23] The risk criteria for assessment of temporary changes in a nuclear power plant
    Cepin, Marko
    RISK ANALYSIS, 2007, 27 (04) : 991 - 998
  • [24] Rapid source term prediction in nuclear power plant accidents based on dynamic Bayesian networks and probabilistic risk assessment
    Zhao, Yunfei
    Tong, Jiejuan
    Zhang, Liguo
    ANNALS OF NUCLEAR ENERGY, 2021, 158
  • [25] Risk Analysis of the City Gas Pipeline Network Based on the Fault Tree
    Yin Yi-lin
    Lin Guang-li
    2009 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2009, : 2477 - 2481
  • [26] Risk management of financial holding company based on fault tree analysis
    Wen Yuechun
    Wang Jingting
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & GLOBAL E-BUSINESS, VOLS I AND II, 2009, : 370 - 374
  • [27] A Longitudinal Study of Human Exposure to Potential Nuclear Power Plant Risk
    Dean Kyne
    Jason T.Harris
    InternationalJournalofDisasterRiskScience, 2015, 6 (04) : 399 - 414
  • [28] A Longitudinal Study of Human Exposure to Potential Nuclear Power Plant Risk
    Kyne, Dean
    Harris, Jason T.
    INTERNATIONAL JOURNAL OF DISASTER RISK SCIENCE, 2015, 6 (04) : 399 - 414
  • [29] CONSIDERATIONS REGARDING RISK MANAGEMENT OF NUCLEAR POWER PLANT AS A CRITICAL INFRASTRUCTURE
    Simion, Cristina
    Popescu, Cristian-Aurelian
    MANAGEMENT IN THE WORLDWIDE CONTEMPORARY CHALLENGES, 2009, : 397 - 403
  • [30] A Longitudinal Study of Human Exposure to Potential Nuclear Power Plant Risk
    Dean Kyne
    Jason T. Harris
    International Journal of Disaster Risk Science, 2015, 6 : 399 - 414