Internal hedging of intermittent renewable power generation and optimal portfolio selection

被引:7
作者
Lucheroni, Carlo [1 ]
Mari, Carlo [2 ]
机构
[1] Univ Camerino, Sch Sci & Technol, Via Madonna delle Carceri 9, I-62032 Camerino, MC, Italy
[2] Univ G dAnnunzio, Dept Econ, Viale Pindaro 42, I-65127 Pescara, Italy
关键词
Levelized cost of electricity; Renewable energy; Intermittency risk hedging; Risk and deviation measures; Generation portfolios;
D O I
10.1007/s10479-019-03221-2
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper introduces a scheme for hedging and managing production costs of a risky generation portfolio, initially assumed to be dispatchable, to which intermittent electricity generation from non-dispatchable renewable sources like wind is further added. The proposed hedging mechanism is based on fixing the total production level in advance, then compensating any unpredictable non-dispatchable production with a matching reduction of the dispatchable fossil fuel production. This means making no recourse to short term techniques like financial hedging or storage, in a way fully internal to the portfolio itself. Optimization is obtained in the frame of the stochastic LCOE theory, in which fuel costs and CO2 prices are included as uncertainty sources besides intermittency, and in which long term production cost risk, proxied either by LCOE standard deviation and LCOE CVaR Deviation, is minimized. Closed form solutions for optimal hedging strategies under both risk measures are provided. Main economic consequences are discussed. For example, this scheme can be seen as a method for optimally including intermittent renewable sources in an otherwise dispatchable generation portfolio under a long term capacity expansion perspective. Moreover, within this hedging scheme, (1) production cost risk is reduced and optimized as a consequence of the substitution of the dispatchable fossil fuel generation with non-dispatchable CO2 free generation, and (2) generation costs can be reduced if the intermittent generation can be partially predicted.
引用
收藏
页码:873 / 893
页数:21
相关论文
共 37 条
  • [1] [Anonymous], 2016, Capital Cost Estimates for Utility Scale Electricity Generating Plants
  • [2] [Anonymous], 2016, ANN ENERGY OUTLOOK 2
  • [3] [Anonymous], 2012, Renewable Electricity Futures Study
  • [4] [Anonymous], 2016, LEV COST LEV AV COST
  • [5] [Anonymous], 2015, Projected costs of generating electricity
  • [6] [Anonymous], 2003, FUTURE NUCL POWER
  • [7] Chen Hong., 2017, Power Grid Operation
  • [8] Strategic bidding and rebidding in electricity markets
    Clements, A. E.
    Hurn, A. S.
    Li, Z.
    [J]. ENERGY ECONOMICS, 2016, 59 : 24 - 36
  • [9] Energy planning and modern portfolio theory: A review
    deLlano-Paz, Fernando
    Calvo-Silvosa, Anxo
    Iglesias Antelo, Susana
    Soares, Isabel
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2017, 77 : 636 - 651
  • [10] Du Y., 2009, UPDATE COST NUCL PO