Peak-load pricing with different types of dispatchability

被引:8
作者
Eisenack, Klaus [1 ]
Mier, Mathias [2 ]
机构
[1] Humboldt Univ, Resource Econ Grp, Unter Linden 6, D-10099 Berlin, Germany
[2] Ifo Inst, Ctr Energy Climate & Resources, Poschingerstr 5, D-81679 Munich, Germany
关键词
Cost recovery; Dispatchability; Energy transition; Flexibility; Market design; Peak-load pricing; Reliability; Renewables; MARKET DESIGN; ELECTRICITY MARKETS; WIND POWER; CAPACITY; GENERATION; STORAGE; RELIABILITY; TIME; RENEWABLES; ECONOMICS;
D O I
10.1007/s11149-019-09394-9
中图分类号
F [经济];
学科分类号
02 ;
摘要
We extend the theory of peak-load pricing by considering that the production with different technologies can be adjusted within their capacity at different speeds. In the established analysis, all production decisions can be made after the random variables realize. In our setting, in contrast, some decisions are made before, others after. This is important, e.g., when increasing capacities of renewables are integrated in electricity systems worldwide. We consider fixed load and three types of capacities: partially dispatchable capacity (e.g., nuclear power-plants) needs to be scheduled ahead of actual production, non-dispatchable capacity (e.g., wind turbines) produces randomly, and highly-dispatchable capacity (e.g., gas turbines) can instantly adjust. If capacities differ in their dispatchability, some standard results of peak-load pricing break down. For example, less capacity types will be employed. Either a system with partially dispatchable technologies only, or a system dominated by non-dispatchable technologies and supplemented by highly-dispatchables occurs. Non- and highly dispatchable technologies can be substitutes or complements. The probability of outage does not rise if non-dispatchable capacity becomes cheaper. In a system with non-dispatchables, capacity decisions cannot be decentralized by conventional markets because cost recovery is not possible. Thus, the integration of renewable electricity generators requires alternative market designs.
引用
收藏
页码:105 / 124
页数:20
相关论文
共 64 条
  • [1] A static deterministic linear peak-load pricing model for the electricity industry: Application to the Peruvian case
    Alayo, Hans
    Garcia, Raul
    [J]. ENERGY ECONOMICS, 2015, 50 : 202 - 206
  • [2] How Do Electricity Shortages Affect Industry? Evidence from India
    Allcott, Hunt
    Collard-Wexler, Allan
    O'Connell, Stephen D.
    [J]. AMERICAN ECONOMIC REVIEW, 2016, 106 (03) : 587 - 624
  • [3] [Anonymous], 2012, TECHNICAL REPORT
  • [4] [Anonymous], 2016, TECHNICAL REPORT
  • [5] [Anonymous], 2015, Technical report
  • [6] A two-part feed-in-tariff for intermittent electricity generation
    Antweiler, Werner
    [J]. ENERGY ECONOMICS, 2017, 65 : 458 - 470
  • [7] PEAK-LOAD PRICING
    BOITEUX, M
    [J]. JOURNAL OF BUSINESS, 1960, 33 (02) : 157 - 179
  • [8] Borenstein S, 2005, RAND J ECON, V36, P469
  • [9] Borenstein Severin, 2016, Electricity Journal, V29, P5, DOI 10.1016/j.tej.2016.07.013
  • [10] Borggrefe F., 2011, 1162 DIW, DOI [10.2139/ssrn.1945724, DOI 10.2139/SSRN.1945724]