Holonic Construction Management: Unified Framework for ICT-Supported Process Control

被引:20
作者
Zekavat, Payam R. [1 ]
Moon, Sungkon [1 ]
Bernold, Leonhard E. [2 ]
机构
[1] Univ New S Wales, Sch Civil & Environm Engn, Sydney, NSW 2052, Australia
[2] Univ Tecn FSM, Dept Civil Engn, Valparaiso 1680, Chile
关键词
Holarchy; Holonic construction management; Rebar supply; Master bundle; Blind lift; Video interface; Hands-free intercom; Electronic construction kiosk; Crane safety; SYSTEM; PROPAGATION; PROJECTS; CRANES; MODEL;
D O I
10.1061/(ASCE)ME.1943-5479.0000316
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Communication in construction still depends on a communication network much like the Romans used, face-to-face meetings and paper. Not surprisingly, this situation has been identified as an inhibitor to increasing productivity and a source of miscommunication, rework, and avoidable accidents. This paper will present a holonic construction management (HCM) model allowing the inclusion of multitype holons organized in resource clusters as well as flowing construction material carrying with it critical information. HCM was successfully tested to provide smooth interface between five different types of holons: (1)equipment, (2)human laborer/operator, (3)material, (4)three-dimensional (3D) space, and (5)information/supply logistics. Results also illustrate the potential of the HCM to integrate the many information and communication technology (ICT) applications into a resilient construction environment where electronic designs are turned into physical products. The results of initial site observations as well as safety statistics were used to identify the most important problem areas. Comparative work studies provided the means to measure differences in performance between traditional and HCM-enhanced approaches. The analysis of the field study results highlighted the effectiveness of a key element of HCM, the creation of new communication corridors between previously disconnected production units or holon. The hardware testing under field conditions highlighted the difficulties of embedding modern ICT systems into the rugged environment of construction as well as the human responses to the changes. Finally, the successful realization of HCM for the rebar supply management emphasized the need for a reevaluation of the traditional contractual relationships as the large gains will not benefit all the participants evenly. (C) 2014 American Society of Civil Engineers.
引用
收藏
页数:15
相关论文
共 37 条
[1]   Need for Alternative Research Approaches in Construction Management: Case of Delay Studies [J].
AlSehaimi, Abdullah ;
Koskela, Lauri ;
Tzortzopoulos, Patricia .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2013, 29 (04) :407-413
[2]  
[Anonymous], J COMPUTING CIVIL EN
[3]   Requirements for BIM platforms in the concrete reinforcement supply chain [J].
Aram, Shiva ;
Eastman, Charles ;
Sacks, Rafael .
AUTOMATION IN CONSTRUCTION, 2013, 35 :1-17
[4]   Learning to see work flow: An application of lean concepts to precast concrete fabrication [J].
Ballard, Glenn ;
Harper, Nigel ;
Zabelle, Todd .
Engineering, Construction and Architectural Management, 2003, 10 (01) :6-14
[5]  
Bernold L.E., 2013, CONSTRUCTION EQUIPME
[6]  
Bernold L.E., 2010, Managing performance in construction
[7]   PLACEMENT-ORIENTED DESIGN AND DELIVERY OF CONCRETE REINFORCEMENT [J].
BERNOLD, LE ;
SALIM, M .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1993, 119 (02) :323-335
[8]   State of Practice of Building Information Modeling in the Mechanical Construction Industry [J].
Boktor, John ;
Hanna, Awad ;
Menassa, Carol C. .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (01) :78-85
[9]   RADIO PROPAGATION FOR VEHICULAR COMMUNICATIONS [J].
BULLINGTON, K .
IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, 1977, 26 (04) :295-308
[10]  
Chacon E., 2008, ADV ROBOTICS AUTOMAT