Lead-time and risk reduction assessment of a sterile drug product manufacturing line using simulation

被引:14
作者
Spindler, Jannik [1 ]
Kec, Thomas [1 ]
Ley, Thomas [1 ,2 ]
机构
[1] Roche Diagnost GmbH, Sandhofer Str 116, D-68305 Mannheim, Germany
[2] EU Res & Innovat Programme Horizon, 2020 Roche Diagnost Site, Mannheim, Germany
关键词
Discrete-event simulation; Lean Manufacturing; Pharmaceutical production line; Discrete manufacturing; Simio; Risk; Production; Filling; Digital twin; Lead-time reduction; Risk assessment; Critical path; Simulation-based scheduling; Sensitivity analysis; Verification and validation; DIGITAL TWIN; SYSTEM;
D O I
10.1016/j.compchemeng.2021.107401
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Digital Twins are finding their way into more and more parts of supply chains. Especially in highly regulated manufacturing processes of the pharmaceutical industry, they are becoming an increasingly valuable tool for improving processes without inducing prolonged downtimes, e.g. through virtual tests and virtual scenario analyses. Simulation can serve as a powerful foundation for digital twins, as it e. g. allows for probabilistic assessments and multi-dimensional optimization of highly complex and dynamic processes. In this study, a simulation model is developed as part of the EU research and innovation programme Horizon 2020. The goal is to explore the benefits of a simulation-based approach and quantify the potential for later adoption in a scalable Digital Twin system. The model is applied as a case study on a sterile drug product manufacturing line of the Roche Diagnostics GmbH in Mannheim, Germany. With the model, sensitivity analyses of process steps, campaign building and batch change scenarios, different shift models, scheduling approaches and delivery breakdown risk assessments were conducted. Results underlined the benefits of simulation-based analyses and the potential for adoption of digital twin technologies in the pharmaceutical industry. (c) 2021 Elsevier Ltd. All rights reserved.
引用
收藏
页数:11
相关论文
共 49 条
  • [1] Integrated production planning and control system for a panelized home prefabrication facility using simulation and RFID
    Altaf, Mohammed Sadiq
    Bouferguene, Ahmed
    Liu, Hexu
    Al-Hussein, Mohamed
    Yu, Haitao
    [J]. AUTOMATION IN CONSTRUCTION, 2018, 85 : 369 - 383
  • [2] Andradottir S., 1997, P 29 C WINT SIM WSC P 29 C WINT SIM WSC
  • [3] [Anonymous], 1998, HDB SIMULATION PRINC
  • [4] ASIM, 2017, ASIM MITT ARB ASM 20 ASIM MITT ARB ASM 20
  • [5] Aurich P, 2016, WINT SIMUL C PROC, P2809, DOI 10.1109/WSC.2016.7822317
  • [6] Verification, validation and accreditation of simulation models
    Balci, O
    [J]. PROCEEDINGS OF THE 1997 WINTER SIMULATION CONFERENCE, 1997, : 135 - 141
  • [7] Balci O., 1988, 1988 Winter Simulation Conference Proceedings (IEEE Cat. No.88CG2659-1), P287, DOI 10.1145/318123.318204
  • [8] Balzert H, 2005, LEHRBUCHER INFORM LEHRBUCHER INFORM
  • [9] Bewersdorff J, 2018, OBJEKTORIENTIERTE PR, V2nd
  • [10] Blocher JD, 1999, PROD OPER MANAG, V8, P357, DOI 10.1111/j.1937-5956.1999.tb00313.x