An improvement in clash detection process by prioritizing relevance clashes using fuzzy-AHP methods

被引:7
|
作者
Hasannejad, Ali [1 ]
Majrouhi Sardroud, Javad [1 ]
Shirzadi Javid, Ali Akbar [2 ]
Purrostam, Towhid [1 ]
Ramesht, Mohammad Hasan [1 ]
机构
[1] Islamic Azad Univ, Cent Tehran Branch, Fac Civil & Earth Resources Engn, Dept Civil Engn, Tehran 19585466, Iran
[2] Iran Univ Sci & Technol, Sch Civil Engn, Tehran, Iran
来源
BUILDING SERVICES ENGINEERING RESEARCH & TECHNOLOGY | 2022年 / 43卷 / 04期
关键词
BIM; clash detection; 3D modeling; Delphi; fuzzy-AHP; Navisworks; COLLISION DETECTION; COORDINATION; REPRESENTATION; KNOWLEDGE; DESIGN;
D O I
10.1177/01436244221080023
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Design coordination and clash detection are the most common and appreciated applications of three-dimensional modeling (3D modeling). In some projects, millions of clashes are detected including a large number of irrelevant clashes. The purpose of this research is to determine the priority of resolving clashes before the construction phase. In this research, the results of Autodesk Navisworks have been used to improve the process of clash detection. Also, this study attempts to use the fuzzy-AHP for weighting criteria and then, by presenting a relationship, to provide a basis to prioritizing clashes for their resolution and, finally, for identifying irrelevant clashes. This method has been tested on a real project, and the comparison of the expert opinions and the proposed method showed that applying the proposed relationship can identify important and irrelevant clashes.
引用
收藏
页码:485 / 506
页数:22
相关论文
共 50 条
  • [1] BIM-based Clash Resolution Process Using Fuzzy AHP Methods
    Hasannejad, Ali
    Javid, Ali Akbar Shirzadi
    Bitaraf, Iman
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2023, 48 (3) : 1749 - 1762
  • [2] Landslide Susceptibility Mapping Using Fuzzy-AHP
    Mokarram M.
    Zarei A.R.
    Geotechnical and Geological Engineering, 2018, 36 (6) : 3931 - 3943
  • [3] A enterprises' supplier evaluating system using fuzzy-AHP
    Cai, Lan
    Guo, Shunsheng
    Zhou, Luming
    Proceedings of 2006 International Conference on Artificial Intelligence: 50 YEARS' ACHIEVEMENTS, FUTURE DIRECTIONS AND SOCIAL IMPACTS, 2006, : 326 - 329
  • [4] Enterprise performance evaluating system using fuzzy-AHP
    Cai Lan
    Guo Shunsheng
    Tang Hongmei
    2006 IEEE INTERNATIONAL CONFERENCE ON INFORMATION ACQUISITION, VOLS 1 AND 2, CONFERENCE PROCEEDINGS, 2006, : 1071 - 1075
  • [5] Road hierarchy with integration of attributes using fuzzy-AHP
    Gulgen, Fatih
    GEOCARTO INTERNATIONAL, 2014, 29 (06) : 688 - 708
  • [6] A Novel Process Model for Marine Accident Analysis by using Generic Fuzzy-AHP Algorithm
    Sahin, Bekir
    Senol, Yunus Emre
    JOURNAL OF NAVIGATION, 2015, 68 (01): : 162 - 183
  • [7] Supplier Selection Using Fuzzy-AHP: A Case Study
    Agrawal, Narayan
    Kant, Shashi
    TRENDS IN MANUFACTURING PROCESSES, ICFTMM 2018, 2020, : 119 - 127
  • [8] Evaluating the knowledge, relevance and experience of expert decision makers utilizing the Fuzzy-AHP
    Aly, S.
    Vrana, I.
    AGRICULTURAL ECONOMICS-ZEMEDELSKA EKONOMIKA, 2008, 54 (11): : 529 - 535
  • [9] Capturing and prioritizing students' requirements for course design by embedding Fuzzy-AHP and linear programming in QFD
    Kamvysi, Konstantina
    Gotzamani, Katerina
    Andronikidis, Andreas
    Georgiou, Andreas C.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2014, 237 (03) : 1083 - 1094
  • [10] Prioritizing Lean Supply Chain Management Initiatives in Healthcare Service Operations: A Fuzzy-AHP Approach
    Laosirihongthong, Tritos
    Samaranayake, Premaratne
    Adebanjo, Dotun
    2013 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM 2013), 2013, : 236 - 242