On range and response: Dimensions of process flexibility

被引:23
作者
Chou, Mabel C. [1 ]
Chua, Geoffrey A. [2 ]
Teo, Chung-Piaw [1 ]
机构
[1] NUS Business Sch, Dept Decis Sci, Singapore, Singapore
[2] Nanyang Technol Univ, Nanyang Business Sch, Singapore, Singapore
关键词
Probability: renewal processes; Production: process flexibility; Facility planning: design; MANUFACTURING FLEXIBILITY; INVESTMENT STRATEGIES; FLEXIBLE RESOURCES; SYSTEMS; BENEFITS; DESIGN;
D O I
10.1016/j.ejor.2010.05.038
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
There are two dimensions to process flexibility: range versus response. Range is the extent to which a system can adapt, while response is the rate at which the system can adapt. Although both dimensions are important, the existing literature does not analytically examine the response dimension vis-a-vis the range dimension. In this paper, we model the response dimension in terms of uniformity of production cost. We distinguish between primary and secondary production where the latter is more expensive. We examine how the range and response dimension interact to affect the performance of the process flexible structure. We provide analytical lower bounds to show that under all scenarios on response flexibility, moderate form of range flexibility (via chaining structure) still manages to accrue non-negligible benefits vis-a-vis the fully flexible structure (the bound is 29.29% when demand is normally distributed). We show further that given limited resources, upgrading system response dimension outperforms upgrading system range dimension in most cases. This confirms what most managers believe in intuitively. We observe also that improving system response can provide even more benefits when coupled with initiatives to reduce demand variability. This is in direct contrast with range flexibility, which is more valuable when the system has higher variability. (C) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:711 / 724
页数:14
相关论文
共 34 条
[11]   Design for Process Flexibility: Efficiency of the Long Chain and Sparse Structure [J].
Chou, Mabel C. ;
Chua, Geoffrey A. ;
Teo, Chung-Piaw ;
Zheng, Huan .
OPERATIONS RESEARCH, 2010, 58 (01) :43-58
[12]  
CHOU MC, 2009, PROCESS FLEXIBILITY
[13]  
DesMarteau K., 1999, BOBBIN, V41, P48
[14]   EFFECTS OF CENTRALIZATION ON EXPECTED COSTS IN A MULTI-LOCATION NEWSBOY PROBLEM [J].
EPPEN, GD .
MANAGEMENT SCIENCE, 1979, 25 (05) :498-501
[15]   OPTIMAL INVESTMENT IN PRODUCT-FLEXIBLE MANUFACTURING CAPACITY [J].
FINE, CH ;
FREUND, RM .
MANAGEMENT SCIENCE, 1990, 36 (04) :449-466
[16]   Process flexibility in supply chains [J].
Graves, SC ;
Tomlin, BT .
MANAGEMENT SCIENCE, 2003, 49 (07) :907-919
[17]   FLEXIBILITY OF MANUFACTURING SYSTEMS - CONCEPTS AND MEASUREMENTS [J].
GUPTA, YP ;
GOYAL, S .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 43 (02) :119-135
[18]   Modeling and analysis of flexible queueing systems [J].
Gurumurthi, S ;
Benjaafar, S .
NAVAL RESEARCH LOGISTICS, 2004, 51 (05) :755-782
[19]   Benefits of skill chaining in serial production lines with cross-trained workers [J].
Hopp, WJ ;
Tekin, E ;
Van Oyen, MP .
MANAGEMENT SCIENCE, 2004, 50 (01) :83-98
[20]   Structural flexibility: A new perspective on the design of manufacturing and service operations [J].
Iravani, SM ;
Van Oyen, MP ;
Sims, KT .
MANAGEMENT SCIENCE, 2005, 51 (02) :151-166